Stormwater management plan 20220156 9 Kauri St SWMP
Plans and drawings: the text below has words only, no drawings.
Original PDF page 41, section 1. The text section number identifies this passage in the reader.
DRAINS Modelling Results Project number: 20220156 Calculations: B. Parry Street Address: 9 Kauri Street Locality: Cooroy, Noosa Shire Council Date: 27/06/2022 Kauri Street A.E.P Qchange (%) Qexisting (m³/s) Qproposed (m³/s) Qchange (m³/s) 1EY 0.021 0.035 0.014 67% 50% 0.026 0.043 0.017 65% 0.2 EY 0.044 0.072 0.028 64% 10% 0.060 0.086 0.026 43% 5% 0.075 0.101 0.026 35% 2% 0.094 0.126 0.032 34% 1% 0.106 0.147 0.041 39% Kauri Street A.E.P Qchange (%) Qexisting (m³/s) Qmitigated (m³/s) Qchange (m³/s) OSD Tank Sizing Summary 1EY 0.021 0.021 0 0% Below ground attenuation chamber 50% 0.026 0.024 -0.002 -8% Total Volume 45.6 m³ 0.2 EY 0.044 0.034 -0.01 -23% 140mm low flow outlet at base 10% 0.060 0.050 -0.01 -17% 300mm high flow outlet obvert at top of tank 5% 0.075 0.070 -0.005 -7% 2% 0.094 0.093 -0.001 -1% 1% 0.106 0.103 -0.003 -3%
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.