Original source · versioned page text
Stormwater management plan 20220156 9 Kauri St SWMP
Plans and drawings: the text below has words only, no drawings.
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
2.4. Flood Considerations Review of the Noosa Shire Council Intramaps flood layers including the Flood Hazards Overlay has identified that the site is located outside of any flood or inundation areas within the locality indicating it is not expected that that the proposed development will be subject to flooding. Project number 20220156 File RECOR Stormwater Management Report - 20220156.docx, 2022-08-08 Revision 0 Page 7 of 26 P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.