Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Stormwater management plan 20220156 9 Kauri St SWMP

of 67

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

                                            Figure 3.2 – DRAINS Pre-development catchment




                                           Figure 3.3 – DRAINS Post-development catchment


The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.
                              Table 3.1 Existing and proposed unmitigated site peak discharge rates

                                                                           Kauri Street
                                                                                                        Qchange
                                           A.E.P               Qexisting      Qproposed    Qchange       (%)
                                                               (m³/s)         (m³/s)       (m³/s)
                                            1EY                 0.021          0.035        0.014        67%
                                            50%                 0.026          0.043       0.017         65%
                                           0.2 EY               0.044          0.072       0.028         64%
                                            10%                 0.060          0.086       0.026         43%
                                             5%                 0.075          0.101       0.026         35%
                                             2%                 0.094          0.126       0.032         34%
                                             1%                 0.106          0.147       0.041         39%

Project number 20220156
File RECOR Stormwater Management Report - 20220156.docx, 2022-08-08 Revision 0                                      Page 9 of 26

P +61 7 5211 1003                         A 37 Mary St, Noosaville Qld 4566            E [email protected]    recorconsulting.com
Log in to download the original file

Stormwater management plan 20220156 9 Kauri St SWMP.pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.