Appendix A- Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Callaghan & Toth
The site is on a 2,000m² parcel of land which has frontage to Pearsons Road. There is an
existing underground interlot drainage system with an outlet to a bioretention and detention
basin in the park to the east. The existing lot drains to a recent subdivision which considered
the detention and treatment of this lot as two residential lots.
3. FLOODING
The existing house drains toward Pearsons Road. The downpipes discharge into existing
kerb and channel which flows to the new subdivision detention/bioretention basin.
The runoff from the existing half of the property to be subdivided currently drains to a low
point at the north east corner where an interlot drainage pipe stub has been placed to allow
for extension of the interlot drainage system. Plan 2102-01A shows the new development
will maintain this flow path and therefore have no effect on the neighbouring property.
4