Appendix A- Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Callaghan & Toth
CONCLUSIONS
The existing Rainwater Detention Basin which is connected to the new lots via existing
interlot drains will be able to attenuate the runoff concentrations back to predevelopment
levels. As well, the external existing interlot drains were sized to carry runoff from this site
when fully developed. Therefore, the development will not have an impact on the hydrology
of the adjacent property.
The extension of the existing interlot drainage pits and pipes provides a runoff collection
system for the new driveway and house so that runoff will be collected inside the property
boundary. This will reduce the runoff to neighbouring properties to less than the existing
conditions.