Collated Planning Report · MCU14/0077

Attached to the e-mail MCU14/0077 & OPW14/0324 Industrial business Type 1 & Retail business Type 4.

of 118

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Original PDF page 51, section 1. The text section number identifies this passage in the reader.

Legend

 

Proposed Landscaping

Bioretention Basins Construction - during
construction and establishment of the
bioretention devices, the supervising RPEQ
must ensure that the device was constructed in
accordance with the document Construction and

Bioretention Basins Construction - A
construction hold point with a council delegate
shall be established once the bioretention
devise underdrainage pipe work is installed. At
the time of inspection, a sample of the drainage

Landscaping - Landscape works must be
supervised, constructed and certified by
qualified persons (please refer to Decision
Notices for definitions).

The Noosa Plan - See Table 14-56 or 14-57 for
minimum Landscaping areas and dimensions.
Landscaping is designed, and to be planted and
maintained in accordance with PSP3 Landscaping
Plants and Guideline.

as shown on DD101 Establishment Guidelines: Swales, Bioretention
Systems and Wetalnds (Water by Design, 2009)
and that the forms contained in section 3.15
including the associated supporting information
and data are completed. These forms and
certification from the RPEQ that the devices has
been constructed in accordance with the above
mentioned guide, all conditions of approval, and
the approved engineering drawings must be
Proposed Bio-retention Basin submitted to council prior to commencement of

to engineers design and detail use.

layer, transition layer, and filtration media
materials must be stockpiled on-site.

Laboratory results must be provided for the filter
media which demonstrate that the media
complies with the specification contained in the
latest versiion of the "Guidelines for Soil Filter
Media in Bioretention Systems" and that the
minimum hydraulic conductivity specified on the
approved engineering plans will be achieved. In
addition, laboratory results must be provided
demonstrating that the transition layer and
drainage layer meet the bridging criteria (stated
in the decision notice). # |Plan

 

 

driveway Proposed Concrete Hardstand
Type 1 - to owners specification

 

 

 

 

Plant Schedule

Botantical Name

 

 

 

 

 

 

 

Common Name Height} Spread | Pot

 

Trees and Large Shrubs

 

  

 

 

    

 

Proposed Trees 4 ( : )ca Cupaniopsis anacardioides | Tuckeroo 6m 6m 45it
C) 6| As Acmena smithii Dwarf Lilly Pilly 2.5m | 2m | 300mm
= 37) Lm Linospadix monostachya | Walking Stick Palm | 25m | 1.5m 300mm
ay Proposed Shrub
Prise Trachelospermum Small Shrubs and Ground Covers
riolour

66 ae Tj | Trachelospermum Tricolour | Tricolour Jasmine | 0.4m | 1.5m 150mm

56 | Px BR Philodendron 'Xanadu' Xanadu 0.8m | 0.8m 150mm
Fence Type 1 - black pve chainwire fence with 3 strands
—eNsm——" of barbed wire above at 2.4 high

 

Bio-retention Basin - 8 piants min. required per m2

 

Gate Type 1 - sliding gate on wheels to match black pvc chainwire
=~ fence with 3 strands of barbed wire above at 2.4 high

       

 

 

 

 

 

 

 

 

 

a | [ | i 40 Ca | Carex appressa Sedge 8/m? | Tufting | 140mm
Security Lighting - a min. of 4 exterior security lights to be installed Wt ip ! 4 ‘ 40 Cf | Carex fascicularis Sedge 8/m? | Tufting | 140mm
— in accordance with BCA and AS. i i icini: itati i
Carex appressa Carex fascicularis Ficinia nodosa Juncus usitatis Lomandra longifolia 40 En |Ficinia nodosa Knobby Club Rus aim? | Tufting |140mm
40 Ju | Juncus usitatis Upright Sedge 8/m? | Tufting | 140mm
40 LI |Lomandra longifolia Mat Rush 8/m? | Tufting |140mm
Minimum Density Required:
Large Trees 8 metre centres
Small Trees 3 metre centres
Shrubs 1.5 metre centres
Groundcovers 0.5 - 1 metre centres
Minimum Sizing Required:
Street and feature trees 45it
Other trees 300mm
Large shrubs 200mm
Groundcovers 150mm
Preparation of garden beds for planting: Use only sun ‘hardened’ plants . Ensure Mulch: Location of Services and Levels: Maintenance: Long Term:

Cultivate existing soil in natural ground to a
minimum depth of 150mm. Import clean topsoil
(sandy loam) to a minimum depth of 300mm,
above original ground level. Organic matter, or
gypsum etc, may also be added as necessary
to improve the soil for the best possible growth.
Test the soil using a ‘Soil Test Kit' to ensure it is
healthy and amend as necessary.

All garden beds to be mounded 300mm min
at centre of bed, above finished pavement
levels, to prevent any ponding around plants.
Fertilize using a slow release fertilizer in 'pill' or
‘granule' form, at time of planting, ensure that
fertilizer does not directly contact roots.

Phone:

COOL ARCHITECTURE

07 5448 8850

healthy root system to all plants to be used.
Under no circumstances are root bound plants
to be used.

Trees:

All 45L trees and large shrubs will need to be
staked securely using 1800mm stakes x 2 or 3
as necessary and tied to stakes usind hesian
webbing, (to prevent plant damage until
established).

Project:

All gardens are to be mulched with 'Tee Tree’
mulch to a minimum depth of 100mm , to be
kept 50mm from stems of plants to avoid coolar
rot.

Drainage:
Please ensure adequate drainage is installed
below gardens and paved and concreted areas.

Please refer to Hydraulics Plan for full
information on services type and location and
finished levels.

General Notes:

Concrete rollback kerb for carpark edges and
garden boundaries as necessary, to Engineer's
detail.

Landscaping
Notes & Schedules

Elaroo Pty Ltd
Proposed

Industrial Dev

 

[email protected]
2A / 35 Seaside Blvd Marcoola Q 4564

Lot 10/100 Rene Street
Noosaville Q

It is the responsibility of the owner to maintain
the property to a satisfactory standard to
Council's approval.

A maintenance regime must be programmed to
maintain mulch, water, fertilizer, pruning and the
care and/or replacment of any damaged or
diseased plant.

Short Term:

For the first four weeks all plants must be
watered for a minimum of 20mins per day
reducing to10mins per day for following 5
months, (always water in relation to rainfall).

Fertilize all plants each spring and when
required during the year. Ensure use of native
‘friendly’ fertilizer. Trees and shrubs to be
pruned after flowering to maintain healthy
growth and shape. Prune at the node for all
natives. Never ‘hard prune’ a plant unless on
reliable authority. Due to breaking down,
organic mulch needs to be ‘topped up' every
few years to maintain a thick cover. Stakes and
webbing which support trees may be removed
after trees are suitably established.

Issue-Date-Initial-Revision Title: Drawing #:

A-05.05.14-LR-Concept Design Landscaping Notes & DD702

ELSES LR Biepcertermen! | Schedules

Hot. 0814-CR-OA Application Dwas A3 Scale: Des: LR/GM Project #: Issue:
1:200 Chk: GM 14.019 H

Used in these records

About this file

File size
8.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Collated Planning Report.pdf · 8.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.