Council archive · source document
Collated Planning Report · MCU14/0077
Attached to the e-mail MCU14/0077 & OPW14/0324 Industrial business Type 1 & Retail business Type 4.
Original PDF page 73, section 1. The text section number identifies this passage in the reader.
d) protects watercourses and drainage lines
in the lowlands; and
e) forms a scenic backdrop for the locality’s
residential neighbourhoods.
AND
O24 Physical and visual links between public S24.1 No solution provided
open space areas and watercourses are
retained.
Pedestrian and bicycle pathways Complies.
O25 Safe and convenient pedestrian and S25.1 Pedestrian and bicycle pathways are provided
bicycle pathways are provided and retained and retained where indicated in the Priority The subject site has established pedestrian footpath within the road
between and around key destinations Infrastructure Plan in Part 15; reserve of both road frontages to the subject site.
including—
a) an east-west link between the Tewantin & AND
Doonan Locality and the Noosa Heads
Locality along the Noosa River foreshore; S25.2 Contributions toward pedestrian and bicycle
b) a north-south link between the Shire pathways are provided in accordance with the
Business Centre and Wallace Park to the Priority Infrastructure Plan in Part 15.
Noosa River foreshore
c) recreation areas off Shorehaven Drive and
Seacove Court;
d) scouting facilities at Gympie Terrace and
Gibson Road;
e) the Australian Rules field at Weyba Road;
and
f) camping and caravanning facilities at
Munna Point.
Foreshore character Not applicable.
O26 The natural landscape character and No solution provided.
vegetation along the foreshore areas of the The proposed development is not along a foreshore area.
Noosa River, Lakes Doonella and Weyba and
Eenie Creek, Noosa National Park, Keyser
Island and Weyba Creek Conservation Parks
is protected.
Watercourses No solution provided. Complies.
O27 The environmental, economic, amenity
and transportation values of the Noosa River The proposed development is not located nearby the Noosa River.
system are protected. Further, all stormwater and effluent from the subject site will be of an
appropriate standard and will be discharged to Council’s relevant
infrastructure.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Collated Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.