Delegated Report - Code - Planning MCU22 0197 [As Published] · MCU22/0197
Services
78. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the approval for Operational Works and the standards and requirements of
the relevant service provider.
79. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
80. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
81. Certification must be submitted to Council from a qualified person* which certifies that the
development has been constructed in accordance with the landscape conditions of this
Decision Notice.
*(Refer to Advisory Note)
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
22393-001 Rev0 Geotechnical Investigation and Slope Stability 26/10/2022
Assessment, prepared by Tectonic Geotechnical &
Environmental Engineers
6. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Concurrence SARA at DILGP SARA Schedule 10, Part 4, The agency provided its
at DILGP Via MyDAS2 Division 3, Table 1 response on 10
at https://prod2.dev- (Planning Regulation January 2023
assess.qld.gov.au/suite 2017): Premises (Reference No. 2212-
/ (for assistance, contaminated because of 32310 SRA). A copy of
contact DILGP at 5352 unexploded ordnance. the response is
9701 or attached.
email:[email protected]
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
Page 22 of 25
Document Set ID: 22435587
Version: 8, Version Date: 15/06/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU22 0197 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.