09-02-23 Operational Management and Maintenance Plan_Issue B

of 29

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
FORM F — PROTECTIVE MEASURES

Purpose: To ensure protective measures are correctly installed to protect the bioretention system while building is occurring in the catchment

Protection option adopted (Option 1, 2 or 3)

OPTION 1 — SURFACE PROTECTION DURING
BUILDING PHASE

Continuous sediment fences installed around
perimeter of filter media and top of batter.

Where landscape works are not to commence
immediately then cover batters with filter cloth.

Protective covering (filter cloth + 25 mm topsoil +
turf) installed across entire filter media area of
system.

OPTION 2 — BYPASS AND EARLY
ESTABLISHMENT

Continuous sediment fences installed around
perimeter of filter media and top of batter.

CHECKED

CHECKED

SATISFACTORY

SATISFACTORY

ACTION (IF
UNSATISFACTORY)

ACTION (IF
UNSATISFACTORY)

INITIAL

INITIAL

 

Where landscape works are not to commence
immediately then cover batters with filter cloth.

 

Temporary bund installed (where required) to
prevent stormwater runoff from entering bulk of
system. Bund keyed into batters of bioretention
and crest level higher than pits and weirs.

 

Temporary protective covering (filter cloth + 25
mm topsoil + turf) installed within bunded area.

OPTION 3 - SEDIMENT BASIN AND
BIORETENTION FUNCTION

Continuous sediment fences installed around
perimeter of filter media and top of batter

Sediment basin installed upstream of bioretention
in accordance with either (including hydraulic
structures):

* WSUD Technical Design Guidelines for SEQ
(SEQHWP)

+ Local erosion and sediment control guidelines or
Best Practice Erosion and Sediment Control
(IECA, 2008)

Suitable access provided to sediment basin for
clean out

Bioretention system installed downstream of
sediment basin

 

Protective covering (filter cloth + 25mm topsoil + |
turf) installed across entire filter media areaof =|

basin.

 

CHECKED

SATISFACTORY

 

 

HOLD POINT: Superintendent and bioretention designer inspection and sign-off before proceeding.

Comments (attach and refer to additional pages if necessary)

NB: Photos attached.

Signed by superintendent:
Print name:

Date:

ACTION (IF
UNSATISFACTORY)

Signed by bioretention designer:

Print name:

Date:

INITIAL

 

 
Log in to download the original file

09-02-23 Operational Management and Maintenance Plan_Issue B.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.