FURTHER REPORT - MCU21/0110 - APPLICATION FOR MATERIAL CHANGE OF USE - RESORT COMPLEX AND ANCILLARY BAR, FOOD AND DRINK OUTLET, OUTDOOR SPORT AND RECREATION, AND CLUB (MINOR EXTENSION To EXISTING CLUBHOUSE) AT 61 NOOSA SPRINGS DRIVE, NOOSA HEADS · ATTACHMENT 3 - (MCU21/0110) - OFFICER REPORT (13 JULY 2023)
Very large file (57.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
c. re-use of harvested stormwater for non-potable outdoor uses including irrigation
of landscaped areas and swimming pool top-up
56. Certification must be submitted to Council from a qualified person which certifies that
the stormwater harvesting tanks and associated reticulation has been installed in
accordance with the requirements of this Decision Notice.
Acid Sulfate Soils
57. An Acid Sulfate Soil Management Plan must be prepared and submitted with the
Operational Works application for the site. The acid sulfate management plan must
include testing, monitoring and treatment requirements for the works.
Services
58. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
59. Certification must be submitted to Council from all relevant service providers (Energex,
NBN and Unitywater which certifies that the development has met the requirements of
this Decision Notice and all applicable legislation at the time of construction.
3
Easements
T
60. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
EN
registered against the title of the property.
61. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
M
easement documentation must be in accordance with the Grantee’s standard
easement terms. Draft easement documentation must be submitted to Council for
H
endorsement.
62. All works must be kept clear of any existing or proposed easements on the subject
C
land, unless agreed otherwise in writing by the Grantee.
TA
Earthworks and Retaining Walls
63. All excavation, fill, soil retaining structures and associated batters must be undertaken
in accordance with an Operational Works approval and contained entirely within the
AT
subject site unless written permission from the respective landowner(s) is provided to
Council.
64. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
with a commercial grade safety fence.
Damage to Services and Assets
65. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Document Set ID: 22048375
Version: 34,
32, Version Date: 24/10/2023
05/07/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.