Skip to the record
The gold standard in government transparency.

Council archive · source document

Landscape Operational Works Plans · MCU24/0153

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                          T
                                                                                                                                                                                                                                         WARNING
                                                                                                                                                                                                                                                                                                                                                                                           LANDSCAPE PLAN (GROUND 1/2)
   LEGEND
                                                                                                                                                                                                                      THE LOCATION OF EXISTING & PROPOSED TELSTRA,
                                                                                                                                                                                                                    ELECTRICITY, SEWERAGE, STORMWATER & WATER ARE
                                                                                                                                                                                                                    SHOWN SCHEMATICALLY ON THE DRAWINGS. PRIOR TO
                STREET TREE GARDEN WITH TIMBER EDGE                                    DECORATIVE STONE                                                   TIMBER EDGE
                                                                                                                                                                                                                     & DURING CONSTRUCTION OBTAIN THE LOCATION OF
                Refer to Plans, Specification Notes, Finishes                          Refer to Plan, Specification Notes                       TE        Refer to Plan, Typical Details, Specification               ALL SERVICES (UNDERGROUND & OVERHEAD) FROM
                Schedule, Typical Details & Plant Schedule 1                           & Finishes Schedule                                                Notes & Finishes Schedule                                       THE RESPONSIBLE AUTHORITY & DESIGNER
                                                                                                                                                                                                                           RESPONSIBLE FOR THE SERVICE SHOWN.
                PLANTING TO COUNCIL FOOTPATH                                                                                                              STEEL EDGE (CORTEN)
                                                                                       DECORATIVE BRICK PAVER
                Refer to Plans, Specification Notes, Finishes                          Refer to Architects For Further Information              SE        Refer to Plan, Typical Details,
                Schedule, Typical Details & Plant Schedule 2                                                                                              Specification Notes & Finishes Schedule




                                                                   T
                MULCHED GARDEN WITH TREES                                              STEPPING STONE                                                     PROPERTY BOUNDARY
                Refer to Plans, Specification Notes, Finishes                          Refer to Plan, Specification Notes                                 Refer to Plans & Specification Notes
                Schedule, Typical Details & Plant Schedule 3                            & Finishes Schedule

                TURF                                                                   MULCHED ACCESS PATH (500mm)
                Refer to Plans, Specification Notes & Finishes                         Refer to Plan, Specification Notes
                Schedule                                                               & Finishes Schedule
                                                                                                                                                                                                                                                                                                                                                           5 BAN ver


                                                                                                                                                                                                                                                                                                     3 ACA cop




                                                                         T
                                                                                                                                                                                                                                                      5 LAU nob

                                                                                                                                                                                                                   2 BAN ver

                                                                                                                                                                                     3 ACA cop
                                                                                                                       5 LAU nob

                                                                                         T
                                                                                                                                                                                                                                                                                                                                                                                  eme                  nt
                                                                                                                        1 BAN int                                                                                                                                                                                                                             1:4           o Bas
                                                                                                                                                                                      dary                                                                                                                                                                           D own T
                                                                                                                                                                            rty   Boun                                                                                                                                                                     rivew
                                                                                                                                                                                                                                                                                                                                                                 a y
                                                                                                                                                                      Prope                                                                                                                                                                           D
                                                                                                                                                                                                                                                                                                          8 OPH jap
                                                                                                                                                                                                                                                                                                          5 FIC pum
                                                                                                                                                                                                                                           20 CAR pig
                     Corten Steel Edge                                                                                                                                                                                                                                                                    30 GAZ rig




                                                                                                                                      TE
Refer to Specification Notes & Finishes                                                                                                                                                                                                       1:8                                                        10 FIC pum
                                                                                                    T




                                                                                                                                                                                                                                                                                                                                                                                              Stepping Stones.
      Schedule For Further Information                                                                                                                                                                                                                                                                                                                                                        Refer to Specification Notes & Finishes
                                                                                                                                                    15 SEN ser                                                                           Decorative Stone.                                                                                                                                    Schedule For Further Information
                 Turf To Disturbed Areas                                                                                                                                                                           Refer to Specification Notes & Finishes
                                                                                                                                                                                                                         Schedule For Further Information
                                                                                                                                                                     1:20                                                              Unit 1 Gate Access.
                                                                                                                                                                                                                Refer to Architects For Further Information
                                                                                                                                                                    Decorative Brick Paver.                                                                                                                                                                                                   Feature Rocks By Builder




                                                                                                                                                                                                                                                                                                                                                                           SE
                                                                                                        T




                                                                                                                                                Refer to Architects For Further Information
                                                                                                                        1:20                                                                                                                                                                                                                                                                  6 VIO hed
                    Driveway Crossover.                                                                                                                     6 JUN con                     1 ARC imp




                                                                                                                                                                                                                                                                                                                                                                            SE
                                                                                                                                                                                                                                                                                                                                                                                              Water Feature by Builder
   Refer to Civil For Further Information                                                   1:40
                                                                       1:8                                                                 10 GAZ rig                                                                                                                     2                                                                                                                   Corten Steel Edge.
                                                                                                                                                                                                                                              4 OPH jap                                                                                                                                       Refer to Specification Notes & Finishes




                                                                                                                                                                                                                                                                                                                                                                                SE
                                                                                                                                                                                                                              1
                                                                                                                                           9 BAN sen                                                                                                                                                                                                                                          Schedule For Further Information
                                                                                                                                                                                                                                           10 OPH jap
                                                                                                                                                                                                                                                                                                                                                ess
                                                                                      Corten Steel Edge.                                                                                                                                                                                                                 Firestair Acc
                                                                 Refer to Specification Notes & Finishes                                                                                                  Visitor Parking                  Visitor Parking                                                                                                                                    Stepping Stones.
                                                                                                            T




                                                                       Schedule For Further Information                                                                                                                                                                                                                                                                                       Refer to Specification Notes & Finishes
                                                                                                                                                                                                                                              15 LOM lit                                                                                                                                      Schedule For Further Information
                                                                                                                                               TE




                                                                                                                       4 DIA cas
                                                                                                                                                                                                                                              2 BLE gib




                                                                                                                                                                                                                                                                                                                        SE
                                                                                                                                                                                                             Water & Rock Features By Builder                                                                                                                                                                  5 CAS gre                                5 VIO hed
                                                                                                                    10 CAR pig
                                                                                                                                                TE




                                                                                                                                                                                                                                                                                                                                  5 VIO hed




                                                                                                                                                                                                                                                                                                                         SE
                                                                             TE                                                                                                                               26 ZOY ten                                                                                                                                                                           2 PIT tob
                                                                                                                    10 SEN ser                                                                                10 FIC pum                       12 LOM lit                                                                         5 PIT tob                                 3 CAS gre

                                                                                                                     4 JUN con
                                                                                                                T




                                                                                                                                                    TE




                               1 ACR imp
                        With Timber Edge                                                                                                                                                                                                                                                                 Letterbox

                                                                                  TE                                                                                                                                                                            6 OPH jap                                  30 OPH jap                                              Unit 2 Gate Access.                                                              1 NAN moo
          Pedestrian Access From Street                                                                                                                                                                                                                                                                                                                            Refer to Architects For Further Information



                 Turf To Disturbed Areas
                                                                                                                                 TE
                                                                                                                   T




                                                                                                                                                         4 WES coa                                                                4 CAL gbf                                         1 WES coa                                                         3 CAL gbf                                                                      3 CAL gbf

                                                                                                                    1 CUP ana                              1 BAN int                                                                                                                  1 BAN int                                                                                           3 WES coa                                  1 BAN int

                                                                                                                                                         10 MYO par                                                                                                                 10 MYO par                                                                                                                                       5 JUN con
                                                                                                                      T




                                                                                                                                                                                                                                                                                                                                                                                                                    anembo consultants
Client:                                             Location:                                               Project Description:                                                        Drawing Title:            JOB No.: S24111298                                                                                                     NORTH
                                                                                                                                                                                                                                                                                                                                                       0     0.5      1      1.5      2      2.5
                                                                                                                                                                                                                  FILE: 241127
ArchEnd                                            51 Elanda St, Sunshine Beach                             Landscape Works                                                                                       DWG. No. LP1                  C   27.11.24   COUNCIL SUBMISSION    CK   TH
                                                                                                                                                                                                                                                                                                                                                       SCALE 1:100 @ A3                                             anembo consultants pty.ltd.       A.B.N. 75 089 473 156

                                                                                                                                                                                                                  SHEET      6 OF 10            B   21.11.24      FOR REVIEW         CK   TH                                            This document is the copyright of anembo consultants & shall                PO Box 24 Moffat Beach Q 4551      Landscape Architects
Development:                                        Lot on Plan:                                            Project Status:                                                             LANDSCAPE PLAN            APPROVED:
                                                                                                                                                                                                                                                A   11.11.24      FOR REVIEW         CK   TH
                                                                                                                                                                                                                                                                                                                                        not be copied without written approval, nor shall it be used                Ph: 07 5437 0000                   Project Management
                                                                                                                                                                                                                   T Hindley AILA 713                                                                                                   except for the development and the site specified. Scale can                email: [email protected]                   Environmental
Development                                        Lot 403 on RP 48112                                      Landscape Operational Works                                                 (GROUND 1/2)              CATEGORY:        MHD        ISSUE DATE          DESCRIPTION       DWN CKD ISSUE DATE    DESCRIPTION         DWN CKD
                                                                                                                                                                                                                                                                                                                                        not be guaranteed when printing from PDF files.                             www.anembo.com                             Arboriculture

Used in these records

About this file

File size
2.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Landscape Operational Works Plans.pdf · 2.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.