7.      Indicate on the plans the available headroom at the entrance to the carparking
        area and at the garage doors.

8.      Indicate on the plans the location and type of the required signposting in
        accordance with Condition 29 of the Decision Notice File No. 2004/5045 dated 1
        August 2005.
Frontage Works
9.      Please provide additional detail, width, materials, levels etc of the required
        footpath across the frontage of the site.
Site Works
10.     It is noted that the submitted plan, drawing No. 16115-OW-1A prepare by SCG
        Consulting Engineers, indicates that sheet piling and other works are to take
        place on the adjoining properties. Please revise the drawing to indicate that all
        works are to be wholly contained within the subject site. Should any temporary
        structures be placed on and/or works need to be undertaken on the adjoining
        properties a letter of approval signed by the adjoining property owners shall be
        submitted to Council with the revised plans.

11.     Please provide comment from a suitably qualified engineer regarding the impacts
        of the proposed site works and the construction of the proposed pools will have
        on the Council sewer main located on the adjoining properties at the rear of the
        site. Should this comment indicate that the proposed works would have an
        adverse affect on the sewer main the proposed works shall be modified to ensure
        that no adverse affects will occur to the sewer main.
Please provide four (4) copies of all information that you are providing. In addition, it
would assist Council if you could also provide an electronic copy of your response.
Pursuant to the conditions of the Development Permit for a Material Change of Use
please note that all bonds and contributions are required to be paid prior to the issue of
the Operational Works approval.

Please be aware that under Section 3.2.12 of the Integrated Planning Act, the applicant
is to respond to any information request within 12 months of the request or otherwise,
the application lapses.
Under the provisions of the Integrated Planning Act 1997, you as the applicant, have
three options available in response to this Information Request. You may give the
assessment manager (in this instance Council) and each referral agency (if any):-

1.      all of the information requested; or

2.      part of the information requested together with a letter asking the assessment
        manager and each referral agency to proceed with the assessment of the
        application; or

3.      a letter:-

        3.1. stating that you do not intend to supply any of the information requested;
             and

        3.2. asking the assessment manager and each referral agency to proceed with
             the assessment of the application.


     Award Winner - Australian Clean Beach
       Challenge 2004 Litter Prevention

Used in these records

About this file

File size
13 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0387 - Information Request - Op Works 26 Orealla Crescent [As Published].pdf · 13 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.