A flood assessment has been undertaken for the existing natural drainage channel within the environmental zone in
Covenant J along the western boundary of Lot 3. The flood assessment provides the 1% AEP flood depths, water surface
levels and velocities along the length of the natural drainage channel bounding Lot 3, for the existing and developed
scenarios, to allow assessment of potential impacts resulting from the proposed development.
4.1 EXISTING NATURAL DRAINAGE CHANNEL FLOOD ASSESSMENT – XP STORM
4.1.1 Flood Assessment – Existing Scenario
The hydrological modelling has been undertaken in XP Storm for the 100-year ARI (1% AEP) storm event using AR&R 87
IFD. In line with Noosa Shire Council requirements, these rainfall intensities were increased by 20% to determine flood
levels in the 2100 Year planning period, to account for predicted future increases in rainfall intensity and event severity.
The following table outlines the IFD Parameters used for the analysed storm durations.
Table 1: IFD Parameters
Storm Intensity (mm/hr)
Duration
(mins) 100 Year ARI
20 229
25 207
30 189
45 155
60 134
90 109
120 94
180 76
To establish the catchments contributing to runoff flowing through the natural drainage channel within the environmental
zone, DEM data was derived from the QLD Government’s Queensland LiDAR Data, in addition to detailed survey data.
Catchment boundaries were then determined based on the LiDAR & survey contours, and a review of the existing piped
stormwater network of the existing shopping Centre. Refer to the Existing Catchment Plan DA-C040 in Appendix E for
further information.
Table 2 below outlines the input parameters for each catchment within the model. The impervious fraction for each
catchment has been determined based on review of aerial imagery. For pervious areas within each catchment, an initial
loss of 27mm and a continuing loss of 2.6mm/hr was adopted, as per information obtained from the Australian Rainfall
and Runoff (ARR) Data Hub. No areal reduction factors have been applied to this local assessment.
Table 2: XP Storm Existing Catchment Model Parameters
Impervious Initial Loss Continuing
Catchment Area (ha) Slope (%) Mannings ‘n’
(%) (mm) Loss (mm/hr)
North 5.875 0 0.160 27 2.6
1.3
Catchment 8.812 100 0.013 0 0
South 4.156 0 0.160 27 2.6
1.8
Catchment 1.039 100 0.013 0 0
The storm durations listed in Table 3 were simulated in XP Storm for each catchment detailed within Table 2 to determine
the critical storm duration for each catchment. Determining the critical storm for each catchment allows the maximum
critical flow to be modelled in the hydraulics scenario, resulting in the maximum flow path along the drainage channel.
www.bornhorstward.com.au Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.