5.2.7   Proposed Treatment Train


        A ‘Treatment Train’ was developed to target each of the pollutants of concern using bio-retention systems to be
        incorporated into the development site layout. This treatment train is illustrated in Figure 3.




                                       Figure 3: Proposed Treatment Train (Entire Development)

5.2.8   Results


        The pollutant reductions for the ultimate developed phase of the site using bio-retention basins, with the inclusion of the
        detailed treatment train, as obtained from the MUSIC model and analysis are summarised in Table 29. below


                                  Table 29: Pollutant Removal Rates Discharge (Entire Development)
                  Pollutant                                  TSS (%)             TP (%)           TN (%)        GP (%)

                  Treatment Train Effectiveness                 81.4              70.0              62.7          97.3

                  WQOs                                          80.0              60.0              45.0          90.0



        As indicated in the table above, the removal rates for the target pollutants; total suspended solids (TSS), total phosphorus
        (TP), total nitrogen (TN) and gross pollutants (GP) are all above the water quality objectives stipulated in the State
        Planning Policy and Noosa Shire Council Planning Scheme. Therefore, the proposed treatment train for these areas will
        yield satisfactory pollutant removal.



                                                     www.bornhorstward.com.au                                              Page 19

Used in these records

About this file

File size
32.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - Stormwater Management Plan and Engineering Response..pdf · 32.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.