5.2.7 Proposed Treatment Train
A ‘Treatment Train’ was developed to target each of the pollutants of concern using bio-retention systems to be
incorporated into the development site layout. This treatment train is illustrated in Figure 3.
Figure 3: Proposed Treatment Train (Entire Development)
5.2.8 Results
The pollutant reductions for the ultimate developed phase of the site using bio-retention basins, with the inclusion of the
detailed treatment train, as obtained from the MUSIC model and analysis are summarised in Table 29. below
Table 29: Pollutant Removal Rates Discharge (Entire Development)
Pollutant TSS (%) TP (%) TN (%) GP (%)
Treatment Train Effectiveness 81.4 70.0 62.7 97.3
WQOs 80.0 60.0 45.0 90.0
As indicated in the table above, the removal rates for the target pollutants; total suspended solids (TSS), total phosphorus
(TP), total nitrogen (TN) and gross pollutants (GP) are all above the water quality objectives stipulated in the State
Planning Policy and Noosa Shire Council Planning Scheme. Therefore, the proposed treatment train for these areas will
yield satisfactory pollutant removal.
www.bornhorstward.com.au Page 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.