Council archive · source document
Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078
Plans and drawings: the text below has words only, no drawings.
Very large file (32.8 MB): may take a few minutes to open.
Original PDF page 31, section 2. The text section number identifies this passage in the reader.
6.00
0
TO BASEMENT
4
BIO-RETENTION BASIN
8.60
PRIV
0
V HO 9.60
8.5
V
8.60
8.70
EXCAVATION APPROX. RL 3.000m 5.50
4.50
V FM
8.70
LOT 7 BUILDING
8.50
4.40
8.6
AN
9.00
0 9.50
8.60
4.30
8.6
8.50 8.60
FH 8.90 BEL 8.700m
ND
0
4.20
5.00 8.40
4.10
0
8.50 0
8.7
8.6
8.6
RIV FH 88.0.300 8.5 FH
4.00
08.70
5.0
8.60
8.00 0 8.60 9.40
E
0
7.0 8.60
6.00
0 7.00
V
50
6.40
8.60
0
8.
8.5
3.40
FH 4.30 8.50
3.50
8.
3.60
8.5 8.60 708.70
3.70
3.80
8.5
8.6050
8.50
0
3.90
4.00
LOT 7 BUILDING
44..120
4.40
0
4.50
9.30
4.60
4.30
4.70
4.80
8. .40
4.90
5.00
6.1
5.10
5.20
5.30
5.50
5.40
5.60
5.70
6.0
5.80
5.90
8.6 9.00
6.2
6.30
8.4
6.40
6.5
7.30
7.00
7.40
6.6
0
6.7
7.10
6.8
0
6.9
7.50
7.60
8
7.70
8.10
7.80
8.00
8.20
8.30
7.2
7.90
BEL 8.600m
8.50
8.40
0
0
0
0
0
0
0
0
0
0
8.5 88.80
8.6 8
8.60
0 8.70
1V:6H MAXIMUM SLOPE
0 .90
0
8.6
9.20
8.50
FH 50
8.5
8.
8.4
BATTER BETWEEN ROADWAY DIVERSION SWALE AT
.60
8.40
0 0 9.10
8.4
0
EXISTING 4-CELL
8.3
V FH AND EXISTING TERRAIN 3 9.00 TOP OF BATTER AROUND
0
1200mm x 600mm 4 8.80 8.90
DEVELOPMENT SITE
BOX CULVERT SP322201
DA-C020
8 8.70 8.80
8.20
8.70
BELOW ROADWAY V V SP322201 THIS DRAWING IS BEST
V VIEWED IN COLOUR AND
5
8.10
FH ON AN ELECTRONIC DEVICE
FH SP322201
V 9 PROJECT NORTH
6 SP322201
SP322201
EXISTING 1200mm x 600mm BOX FH FH
CULVERT BELOW ROADWAY V
J:\2022\22159\05_DRAWINGS\DRG\DA\DRG\DA-C010.DWG
V
15 V
DIMENSIONS IN METRES EXCEPT WHERE A1 UNREDUCED
FH SHOWN OTHERWISE. CULVERT AND PIPE
SP322201 SIZES IN MILLIMETRES A3 REDUCED
V FH V FH SCALES UNREDUCED / REDUCED
FHV 0 10 20 30 40 50m
V 1 : 1000 / 1 : 2000
FHV
FH
FH V 16 10
FH 14 SP322201
SP322201 SP322201 STATUS
DEVELOPMENT APPLICATION
DWN DES CHK APP CLIENT PROJECT SUBJECT PROJECT No.
SCAN QR CODE TO
REV DATE DESCRIPTION
ASSOCIATED CONSULTANTS APPROVED CHECKED
21/11/2023 6:10:20 PM
B 21.11.23 RFI RESPONSE ISSUE SG SG NR NR STOCKWELL DEVELOPMENT NOOSA CIVIC VILLAGE EARTHWORKS LAYOUT 22159
CONFIRM CURRENT A 25.05.23 DA ISSUE BB SG JD NR
GROUP PTY LTD MIXED USE DEVELOPMENT DRAWING No. REVISION
DRAWING REVISION RPEQ
http://docs.bornhorstward.com.au/revision/
DATE DATE DA-C010 B
COPYRIGHT © - This document is and shall remain the property of Bornhorst & Ward Pty. Ltd. The document may only be used for the purpose for which it was commissioned and in accordance with the terms of engagement. Unauthorised use of this document in any form whatsoever is prohibited.
0 10 20 30 40 50 100 ORIGINAL SIZE A1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.