Council archive · source document
Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078
Plans and drawings: the text below has words only, no drawings.
Very large file (32.8 MB): may take a few minutes to open.
Original PDF page 48, section 1. The text section number identifies this passage in the reader.
LOT 1
NORTHERN CATCHMENT SIZE
= 12.5086m2
RL
NO 8.00 NO
MINA MINA
L L FU
TU
RE
PE
DE
ST
RIAN
CO
NN
EC
TIO
N
BU
SINE
C SS
TR 565m
E 2
BU
SINE
660 SS
m2
EXISTING FOOTPATH
BIO-BASIN
EA 19
SE 2P
PE ONN
ME AR
KIN
C
NT
DE EC
GB
A M AY
ST TIO
RL S
8.9
RIA N
5
CO
VE
N B OV
NA
NT
RID ER
J
VEHICLE CROSSOVER
GE
AM
EN
ITIES
EXISTING FOOTPATH
BIO-BASIN
LOT 3
BA
R AN
D
BIO-BASIN
620 DINING
m2
RL 6000
8.9
5
BA
VEHICL
R AN
D VILL
RL
480 DINING AG
E CROSS
8.2 EM
5
m2 895
IXED
US
OVER
m2 E
LOT 7
LO
AD
BIO-B
ING
6000 /
ASIN
N
RE
4000
TIO
VA
FU
RL D
NO
IN W SE
AN BELO
7.5
E
0 TS
US
AR
VILL
IXED
VILL AG
EM
m2
RE AG
0
IXED
EM
CR EM
2050
EA IXED 690
370
15 TIO 615 VIL US
AG
00m N US
LA m2 E
m2 E
VILL
2 GE
E)
GR
IBL
RL
EE
SS
6.7
CE
5 N
N
AC
TIO
4000
VA
AIR
NO
IN W
HE NK
D
CH
AN BELO
(W XI RA
EL
TS
AR
TA
W
LO
NE
LA
BE
LE
NT
YC
NE
VILL
BIC
LA
ON
ME
RL
ING
VATI AG
RP LL
LE
INNO
CA RALE
6.0 EM
SE
E
S AND
AR
W
YC
0 ART
US
BELO
IXED
BA
BIC
CK
340
PA
US
IXED
m2 E
ING
DO
RP LL
m2
T
CA RALE
OM
AR
AN
EM
VILL
PA
PL
RO
AG
ING
340
N
VILL
AG
EM
TIO
CH
IXED AG
350
VILL
EM
AD
TA
IT
US
0m 2 E 410
IXED
SW
BS
RL PE
US
LO
DE
5.2
m2 E CR STRIA
SU
5 OS
0
SIN N
2000
G
PA 86
3000 R
0 BA KING
YS
E
S NT AK
US
RO ET
IXED
)
E
AD
m2
VA TR
SIN
MA EME
EM
-BA
ITIES
340
AG
BIO
TE
IN
S
VILL
EN
EA
AM
(PRI
PA 28
R
LO BA KING
FU T 3
YS
DE TURE
T
AN
VE
SOUTHERN CATCHMENT SIZE
PL
LO
PM
EN
T
= 7.373m2 VE
HI
CL
E
CR
OS
SO
VE
R
IN
AS
-B
BIO
H
AT
PROJECT SUBJECT PROJECT No.
NOOSA CIVIC MIXED USED PROPOSED CATCHMENT PLAN 22159
DEVELOPMENT FOR FLOOD MODELLING DRAWING No. REVISION
C-DA041 A
0 10 20 30 40 50 ORIGINAL SIZE A3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.