Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078

of 100

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (32.8 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 6, section 1. The text section number identifies this passage in the reader.

                                                     Figure 1: Site Locality Plan

2.2   PROPOSED DEVELOPMENT

      The following points outline the extent of works for the proposed development:

          −   Material change of use and building work in support of the proposed development;

          −   Construction of the mixed-use development within Lot 3, with basement carparking, commercial and retail
              outlets, and residential build-to-rent apartments;

          −   Construction of mixed-use three-story buildings within Lot 7, with surface carparking, commercial and retail
              outlets, and residential build-to-rent apartments;

          −   The existing private access roadway will remain. Access to both Lot 3 and 7 will be via five proposed driveway
              crossovers onto the existing private roadway, and multiple pedestrian entrances to both sites;

          −   A new pedestrian bridge across the existing natural drainage channel within the environmental zone in Covenant
              J between the proposed development and the existing shopping centre; and

          −   Modifications to the existing shopping centre loading bay to allow for the proposed pedestrian bridge landing.

      Refer to the development drawings in Appendix A for further details of the proposed development.




                                                 www.bornhorstward.com.au                                              Page 2

Used in these records

About this file

File size
32.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - Stormwater Management Plan and Engineering Response..pdf · 32.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.