Skip to the record
Every meeting, every word.

Council archive · source document

Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078

of 100

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (32.8 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 60, section 1. The text section number identifies this passage in the reader.

Figure 13: Developed Mitigated – Combined Tank & Bio-Retention Basin Outlet Graph (RL)




Figure 14: Combined Tank & Bio-Retention Basin Discharge via 2 x Pipe Orifices (m3/s)




Figure 15: Combined Tank & Bio-Retention Basin Overflow Weir Discharge (m3/s)

Used in these records

About this file

File size
32.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - Stormwater Management Plan and Engineering Response..pdf · 32.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.