Skip to the record
The gold standard in government transparency.

Council archive · source document

Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078

of 100

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (32.8 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 67, section 1. The text section number identifies this passage in the reader.

Figure 3: Lot 7 North Bio-Retention Node Parameters

BORNHORST
+WARD

 

l oaeeleemlenemnieelene een iaeeleeieleeloel

I

a

[eeleeeeeenloeeeleeeeenlemeleel

 

Properties of LOT 7 NORTH BIO (27m2)

 

 

Location [LOT 7 NORTH BIO (27m2J
inlet Properties~
Low Flow By-pass (cubic metres per sec)
High Flow By-pass (cubic metres per sec)
‘Storage Properties
Extended Detention Depth (metres)
Surface Area (square metres)

Filter and Media Properties
Filter Area (square metres)
Unlined Filter Media Perimeter (metres)
Saturated Hydraulic Conductivity (mm/hour)
Fitter Depth (metres)
TN Content of Filter Media (mg/kg)
Orthophosphate Content of Filter Media (mg/kg)

'

8
8

Ny] =
S| 3

els
s
28

Lining P ian
Is Base Lined?

‘Vegetation Properties

 

Vaile

 

@ Vegetated with Effective Nutrient Removal Plants

 Vegetated with Ineffective Nutrient Removal Plants |
C Unvegetated |
- Outlet Properties >
Overfiow Weir Width (metres) 150 i
Underdrain Present? I Yes [~ No |
Submerged Zone With Carbon Present? T Yes W No 7

Products >> +

Yes [¥ No |

 

 

 

 

 

 

 

(nfitration Properties a
| Exfittration Rate (mm/hr) Faxes... Notes... More i
| | Hemet || a || vem lf

 

 

 

ee

 

Figure 4: MUSIC Treatment Train Results

LOT 3 ROAD (0.80Sha) [Sealedroad]

LOT 3 GROUND (0.516ha)

LOT 3 ROOF (1.504ha)

LOT 3 BIO (560m2)

LOT 7 NORTH ROAD (0.145ha)

LOT 3 SOUTH FUTURE GROUND (0.099ha)

3 SOUTH FUTURE ROAD (0.200ha) [Sealedroad]

OT 3 SOUTH FUTURE ROOF (0.237ha)

Treatment Train Effectiveness - Receiving Node

EXISTING ROAD UN-TREATED (0.14

LOT 7 NORTH BIO ‘ort SouTH BO

LOT 7 NORTH ROOF (0.106ha)

Receiving Node

LOT 7 SOUTH ROAD (0.216ha) [Sealedroad)

LOT 7 SOUTH ROOF (0.140ha)

 

Flow (ML/yr)

Total Suspended Solids (kg/ yr)
Total Phosphorus (kg/yr)
Total Nitrogen (kg/yr)

 

Gross Pollutants (kg/yr)

 

 

 

Used in these records

About this file

File size
32.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - Stormwater Management Plan and Engineering Response..pdf · 32.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.