Skip to the record
Every meeting, every word.

Council archive · source document

Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078

of 100

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (32.8 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 70, section 1. The text section number identifies this passage in the reader.

NOOSA CITY PLAN - ACID SULFATE SOILS OVERLAY CODE                                         Job Ref No.: 22159
Performance Outcomes and Acceptable Solution


Table 8.2.1.3 – CRITERIA FOR ASSESSABLE DEVELOPMENT



                                         Editor’s note – National Sampling and
                                         Identification Methods Guidelines is a
                                         reference to:
                                         (a) National Acid Sulfate Soils
                                             Guidance: National acid sulfate
                                             soils sampling and identification
                                             methods manual, Department of
                                             Agriculture and Water Resources,
                                             Canberra (Sullivan et al, 2018); and
                                         (b) National Acid Sulfate Soils
                                             Guidance: National Acid Sulfate
                                             Soils Identification and Laboratory
                                             Methods Manual,
                                         (c) The Australian Standard 4969.

                                         OR

                                         AO1.2
                                         The disturbance of ASS avoids the          N/A
                                         release of acid and metal contaminants
                                         by:-
                                         (a) Undertaking an ASS investigation
                                              conforming to the National Acid
                                              Sulfate Soils Guidance;
                                         (b) Neutralizing existing acidity and
                                              preventing the generation of acid
                                              and metal contaminants using
                                              strategies documented in the Soil
                                              Management Guidelines: and
                                         (c) Preventing the release of surface or
1.  Solution: PO = Performance Outcome
                A/O = Acceptable Outcome
                N/A = Not applicable to this proposal
Noosa Civic Village Mixed Use Development, Noosaville

Used in these records

About this file

File size
32.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - Stormwater Management Plan and Engineering Response..pdf · 32.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.