NOOSA CITY PLAN - WATER QUALITY AND DRAINAGE CODE Job Ref No.: 22159
Performance Outcomes and Acceptable Solution
Table 9.4.8.3 – CRITERIA FOR ASSESSMENT
COUNCIL USE
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES SOLUTIONS1 COMMENTS
ONLY
construction.
P02 AO2.1 PO
Stormwater drainage infrastructure is Stormwater drainage planning, design The proposal meets the requirements of Council’s
planned, designed and constructed to: and construction is in accordance with Infrastructure design planning scheme policy and does
(a) incorporate allowance for PSP6 Engineering Design Standards – not result in an increase in flood level or flood
increased flood risk and tidal Roads. Drainage and earthworks and duration on upstream, downstream or adjacent
inundation through pipework the lasted version of the Queensland properties.
as a result of climate change Urban Drainage Design Manual.
and sea level rise;
(b) ensure the development is AO2.2 A Site Based Stormwater Management Plan (SBSMP)
adequately drained; and The stormwater drainage system has been prepared and submitted as part of this
(c) ensure stormwater is managed connects to a lawful point of discharge in Development Application for all major and minor
and lawfully discharged accordance with PSP6 Engineering Design stormwater management measures in compliance
without altering stormwater Standards – Roads, drainage and with PSP6 Engineering Design Standards – Roads.
drainage characteristics earthworks. Refer to Bornhorst and Ward Engineering report for
external to the site. details
AO2.3
Stormwater flows discharging form the
development are demonstrated to be
consistent with pre-development
characteristics.
AO2.4
Development provides for the
management of stormwater to
incorporate appropriate allowance for
climate change impacts (including rainfall
intensity and sea level rise), in
accordance with PSP6 Engineering Design
1. Solution: PO = Performance Outcome
A/O = Acceptable Outcome
N/A = Not applicable to this proposal
Noosa Civic Village Mixed Use Development, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.