Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078

of 100

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (32.8 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 81, section 1. The text section number identifies this passage in the reader.

NOOSA CITY PLAN - WATER QUALITY AND DRAINAGE CODE                                                                                           Job Ref No.: 22159
Performance Outcomes and Acceptable Solution

Table 9.4.8.3 – CRITERIA FOR ASSESSMENT
                                                                                                                                                 COUNCIL USE
     PERFORMANCE OUTCOMES                       ACCEPTABLE OUTCOMES                  SOLUTIONS1                   COMMENTS
                                                                                                                                                    ONLY

                                          development are made at no cost to
                                          Council

                                          AO4.4
                                          Development avoids stormwater inflow
                                          and infiltration to the sewer
                                          infrastructure network.
                                          AO4.5
                                          Stormwater infrastructure is designed to
                                          minimize maintenance costs and the
                                          requirement for specialized equipment
                                          for maintenance techniques.


P05                                       AO5.1                                         N/A
Stormwater drainage infrastructure is     Stormwater drainage infrastructure                      The proposed development is not crossing any
aligned to avoid crossing waterways,      avoids crossing waterways, wetlands                     waterways.
wetlands, drainage lines and ecological   drainage lines and ecologically
important areas, or where it is           important areas or follows the edge of
demonstrated this is unavoidable,         existing disturbed area.
disturbed areas are reinstated and
revegetated upon completion of works.     AO5.2
                                          Stormwater drainage infrastructure is
                                          co-located with other infrastructure
                                          within a combined utility corridor
                                          where appropriate.

                                          AO5.3
                                          Temporary vehicular crossing of
                                          waterways must be designed and

1.  Solution: PO = Performance Outcome
                A/O = Acceptable Outcome
                N/A = Not applicable to this proposal
Noosa Civic Village Mixed Use Development, Noosaville

Used in these records

About this file

File size
32.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - Stormwater Management Plan and Engineering Response..pdf · 32.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.