NOOSA CITY PLAN - WATER QUALITY AND DRAINAGE CODE Job Ref No.: 22159
Performance Outcomes and Acceptable Solution
Table 9.4.8.3 – CRITERIA FOR ASSESSMENT
Editor's note— Water contaminants are Planning Policy (Appendix 2).
prescribed in the Environmental
Protection Act 1994. Editor’s note— PSP6 Engineering Design
Standards Roads, drainage and earthworks
provides guidance on requirements for
preparing an Erosion Management Plan.
AO14.2
Construction works are designed and
managed to restrict the extent of clearing
and soil exposure to the minimum
necessary for access, and safe construction
at any one time.
AO14.3
For buildings:
(a) upstream runoff is diverted
around the construction site;
(b) sediment barriers are provided
downslope of disturbed areas to
prevent sediment washing into
gutters, drains and waterways,
wetlands or drainage lines eighter
on or off the site; and
(c) temporary or permanent
downpipes are connected tot the
stormwater system before laying
the roof; or
(d) localized erosion is avoided by
directing flow from downpipe over
non-erosive areas.
AO14.4
Chemical flocculants used as part of an
1. Solution: PO = Performance Outcome
A/O = Acceptable Outcome
N/A = Not applicable to this proposal
Noosa Civic Village Mixed Use Development, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.