Council archive · source document
Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078
Plans and drawings: the text below has words only, no drawings.
Very large file (32.8 MB): may take a few minutes to open.
Original PDF page 92, section 1. The text section number identifies this passage in the reader.
NOOSA CITY PLAN - WATER QUALITY AND DRAINAGE CODE Job Ref No.: 22159
Performance Outcomes and Acceptable Solution
Table 9.4.8.3 – CRITERIA FOR ASSESSMENT
equivalent persons, the design of the
system achieves a low to medium risk
classification in accordance with
Seqwater’s Land Use Risk Tool for
onsite sewerage facilities.
N/A
PO17
Development ensures that: AO17
(a) the discharge of wastewater to a No acceptable outcome is prescribed.
waterway or external to the site is
avoided; or
(b) if the discharge cannot practicably be
avoided, the development minimises
wastewater discharge through re-
use, recycling, recovery and
treatment.
Note—The preparation of a wastewater
management plan can assist in
demonstrating achievement of this
performance outcome.
Editor’s note—This code does not deal
with sewerage which is the subject of
the Wastewater code.
1. Solution: PO = Performance Outcome
A/O = Acceptable Outcome
N/A = Not applicable to this proposal
Noosa Civic Village Mixed Use Development, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.