Council archive · source document
08/1985 - MCU - Retail Type Business Type 2 - Shop [As Published] · 132008.1985
INTEGRATED PLANNING ACT 1997
Part D, Version 3.1, 3 March 2008
Table B Proposed floor area
Proposed site cover
Proposed maximum number of storeys
Proposed maximum height above natural ground level
Table C Existing number of on-site car parking bays
Existing area of landscaping
Existing type of vehicle cross-over (for non-residential uses)
Existing maximum vehicular servicing arrangement (for non-residential uses)
Table D Proposed number of new on-site car parking bays
Proposed area of new landscaping
Proposed type of new vehicle cross-over (for non-residential uses)
Proposed maximum new vehicular servicing arrangement (lor non-residential uses)
Proposed building of a retaining wall (tick applicable box and refer to Advice) LINo
LJ Yes
Mandatory information
6. Confirm the following mandatory information accompanies this application:
Confirmation of todgement | Method of lodgement
For all applications
{i) Plans showing the nature and location of the proposed use on the premises and a statement about
the intensity and scale of the proposed use (e.g. number of employees. days and hours of operation, numberof |] Confirmed
visitors, number of seals, capacity of storage area)
When the application involves reuse of existing buildings
(ii) Plans showing the size and location of the buildings to be reused ID Confirmed
Ona |
When the application involves new building work
(iii) Plans showing the size and location of the proposed new building work = Confirmed
Ona |
When the application involves reuse of other existing works
(iv) Plans showing the nature and location of the works to be reused [co Confirmed
Ona |
When the application involves new operational work
(v) Plans showing the nature and location of the proposed new operational works id Confirmed
Ona |
OFFICE USE ONLY
Date received , Reference numbers
Advice for completing Part D
General advice
+ — Part A must also be completed for all (DAS development applications.
* The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another
question.
« When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) for coastal development applications, use the process
from the information sheet Electronically paying fees to the Environmental Protection Agency (EPA) and securely attach the form Electronic Funds
Transfer (EFT) payment notification to this application.
Q3 A development permit authorises development to occur. A preliminary approval is a step in the approval process and does not authorise
development to occur - a subsequent application for a development permit must be sought.
Table D | If the MCU application involves operational work that is the building of a retaining wall on the premises, the application is taken also to be for
the operational work if approval for the operational work has not been applied for in this application or in a separate application.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1985 - MCU - Retail Type Business Type 2 - Shop [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.