Minor Change Existing Approval MCU17 0512.01 · MCU17/0512.01
Officer: Lisa Pienaar Direct Telephone: 07 53296514 Our Reference: MCU17/0512.01 : JELDER Your Reference: n.a 2 August 2019 Ms JM Tynan C/- Hogg and Lamb 181 Roberson St FORTITUDE VALLEY QLD 4006 [email protected] Dear Sir/Madam, Decision Notice – Minor Change Planning Act 2016 I refer to your application received on 25 June 2019, requesting a minor change to an existing development approval. Council decided your requested changes. Details of the decision are as follows: APPLICATION details Application No: MCU17/0512.01 Street address: 15 Arakoon Cres Sunshine Beach Qld 4567 Real property description: Lot 776 RP 48111 Planning Scheme: The Noosa Plan (8 June 2018) Decision details The following type of approval was issued on 9 October 2017. Development Permit for Material Change of Use (Dwelling) In relation to the request to make a minor change to the existing approval, Council on 29 July 2019, decided to approve the requested changes. The changes are detailed below. A. Approve the change. B. Amend condition 2 to read as follows: currency period of approval The currency period for this development approval is 6 years starting the day that the original development approval MCU17/0512 took effect. assessment manager conditions PLANNING When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date A100 TP03 Site Plan, drawn by Hogg & Lamb 5 July 2019 A200 TP03 Ground Floor Plan, drawn by Hogg & Lamb 5 July 2019 A201 TP03 Upper Floor Plan, drawn by Hogg & Lamb 5 July 2019 A300 TP03 East & West Elevation, drawn by Hogg & Lamb 5 July 2019 A301 TP03 South Elevation, drawn by Hogg & Lamb 5 July 2019 A302 TP03 North Elevation, drawn by Hogg & Lamb 5 July 2019 A403 TP03 Section A, drawn by Hogg & Lamb 5 July 2019 Building Height The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground surface. Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Building Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Landscaping A minimum of 20% of the site must be retained as soft landscaping. Existing trees on the site and within road reserves must be retained, except where required to be removed to accommodate the approved dwelling. Trees to be retained must be protected from clearing or construction activities by: clearly marking vegetation to be retained with flagging tape installing protective fencing around the drip line of the vegetation restricting stockpiling, storage and vehicle parking to those areas which are already cleared using low impact construction techniques around vegetation. Screening vegetation must be planted along the northern, southern and eastern boundaries in accordance with Council’s Planning Scheme Policy PSP3 Landscaping Plants and Guideline. Street Trees The property driveway must be located to avoid trees in the street verge. Alternatively, a request must be made to either Council to relocate the tree clear of the driveway. Undercroft Screening Undercroft skirting or screening (eg. timber battens) must be provided to the full height of any undercroft areas of the approved dwelling (including carparking structures) that are higher than 3 metres above ground level at the perimeter of the building/structure. OR, dense landscaping must be provided the eastern elevation to screen the full height of the dwelling’s undercroft area at that location. Drainage and Earthworks All cut and fill must not exceed 2 metres in depth relative to natural ground level. Fill material placed over services must not impose any additional surcharge loading on the service. Excavation must not be carried out within 600mm of any utility infrastructure (to top, sides and base of services). A retaining wall must be provided to support the soil surrounding utility infrastructure where proximate to excavation activities. Compaction with a vibrating roller must not be carried out within 600mm of any utility infrastructure. Other than for accessways, filling must not extend more than 1 metre beyond the footprint of the approved dwelling when measured from its outer walls. Earthworks required on site must be carried out in accordance with Council’s Planning Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional ponding of water on any adjoining lands or concentrate or direct overland flow on to an adjoining property. Geotechnical Stability All works must be carried out in accordance with the recommendations of the Slope Stability Assessment and Soil Test Report prepared by SCG Consulting Engineers and dated 26 April 2017. Coastal Protection External colours and finishes of the building must comprise of muted/environmental tones that blend with the natural environment. referral agencies Not applicable. advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: PLANNING Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act. Infrastructure Charges This Development Permit will not trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Charges Resolution” made pursuant to the Sustainable Planning Act 2009 and in conjunction with the State Planning Regulatory Provision (Adopted Charges). Property Driveway and Vehicle Crossover The planning scheme declares Operational Work for the construction of a driveway and vehicle crossover to the property to be self-assessable against the Detached House Driveways Code. A self-assessable application is required to be submitted to Council for the vehicle crossover (*link below) OR if the proposed driveway and vehicle crossover does not comply with each Acceptable Solution contained in the Code, a Development Permit for Operational Works the work is required to be obtained from Council. *http://www.noosa.qld.gov.au/documents/40217326/40415739/Vehicle%20Crossover%20Application%20Pack.pdf property notes Not applicable. variation approval details Not applicable. further development permits required Type of Development Permit Required Subject of the required Development Permit Development Permit for Building Works All building works submissions Not applicable. rights of appeal You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. other details If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. YF Enc: Appeal Rights Approved Plans/Documents cc. Unitywater DECISION NOTICE HISTORY Original Decision Notice – MCU17/0512 – 9 October 2017. Decision Notice - Minor – MCU17/0512.01 – 29 July 2019, with an amendment to conditions 2. Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer2.xml] Page 6 of 6 [word/footer3.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 6 [word/footer4.xml] Page 2 of 3 [word/header4.xml] 3 [Attachment: image2.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU17 0512.01Related documentApplication case desk ↗
About this file
- File size
- 325 KB (small file)
- File type
- DOCX
No other editions are linked here.