Skip to the record
Accept no imitations.

Original source · versioned page text

NOOSAVILLE FORESHORE INFRASTRUCTURE MASTERPLAN · Noosaville Foreshore Infrastructure Master Plan

of 38

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                                                                                         Reorganise the street
          Key features:                                                                                                                                                                  to enable equitable
                                                                                                                                                                                         pedestrian access

          — Retain existing car parking bays, loading zones, and maintenance and delivery access                                                                                         Widen riverside promenade
                                                                                                                                                                                         to an acceptable standard
          — Establish two swimming areas, where boat users are restricted to promote safety                                                                                              for all abilities access

          — Widen shared path, enhance riverside promenade and upgrade bridge to promote all                                                                                                                                              E
                                                                                                                                                                                         Introduce over water
                                                                                                                                                                                                                                   E R RAC E
                                                                                                                                                                                                                                 T        R
            abilities access and create an inclusive pedestrian user experience                                                                                                          structure for all abilities
                                                                                                                                                                                                                          M P I E ES H O
                                                                                                                                                                                         access and enjoyment           Y
                                                                                                                                                                                                                       G TF      O R
                                                                                                                                            Establish a swimming area                    of the rivers edge
                                                                                                                                                                                                                       EAS
          — Enhance two ‘Cool Refuge Areas’ with large shade trees and cool breezes                                                         protected from motor boats




                                                                                                                                                                                                                                                                        W
          — Upgrade and enhance parkland facilities and propose one new amenities




                                                                                                                                                                                                                                                                          I L
                                                                                                                                                                                                                                                                               L
          — Retain and enhance existing recreation, sports and play opportunities




                                                                                                                                                                                                                                                                               I A
                                                                                                                                                                                                                                          H
                                                                                                                                                                                                                                              O




                                                                                                                                                                                                                                                                                   M
                                                                                                                                                                    K
                                                                                                                                                                PAR




                                                                                                                                                                                                                                               W
                                                                                                                                                           CH
                                                                                                                                                        BEA                                           E




                                                                                                                                                                                                                                                                                        S
                                                                                                                                                                                              T C




                                                                                                                                                                                                                                                  A
                                                                                                                                                    N
                                                                                                                                                ICA




                                                                                                                                                                                                                                                                                        T
                                                                                  Upgrade and widen the
                                                                                                                                           PE L                                          E




                                                                                                                                                                                                                                                       R
                                                                                                                                                                                                                       Upgrade existing
                                                                                                                                                                                   P I
                                                                                  shared path throughout




                                                                                                                                                                                                                                                        D
                                                                                                                                                                                                                       amenities
                                                                                                                                                                             Y M
                                                                                  the parkland
                                                                                                                                                                         G




                                                                                                                                                                                                                                                           S
                                                                                                                                                                                                                                                             T
                                                                                  Retain and improve




                                                                                                                                                                                                             R D
                                                                                  existing car park
                                           Enhance picnic
                                                                                                         P
                                           facilities ensuring
                                                                                                   T R AM R K




                                                                                                                                                                                                           B A
    Enhance picnic                         all abilities access                                   A
                                                                                               BO ELY PA
    facilities and ensure                                                                                                                                                    Retain car parking
                                                                                                  D
    all abilities access                                                                       AN




                                                                                                                                                                                                          W E Y
                                           Upgrade existing
                                           amenities




                                                                                                                                                   S T
    Retain and enhance
    Boat Ramp facilities




                                                                                                                                                  E S
    Introduce bike and                                                                         E
    motorbike parking                                                                    T C                                         S T
                                                                                    E
                                                                              P I




                                                                                                                                                J A M
                                                                                                           Introduce all ages,
                                                                  G   Y M                                  all abilities play
                                                                                                                                  A R D



                                                                                                           opportunities along
                                                                      Retain and upgrade                   the foreshore
                                                                      tennis court facility
                                                                                                                                 E D W




                                                                                          E L I
                                                                                                   Z A B
                     Redirect a safe, wide                                                                   E T H
                     and shaded shared                                                                                   S T
    S T




                     path to the rivers edge
                                                                                                                                                                                                                                                       Timeline Legend
                     Create a safe, wide                                                                                                                                                                                                                       High Priority Projects
  A S




                     and shaded shared
                     path around the
                     Boat Ramp facility                                                                                                                                                                                                                        Medium Priority Projects
T H O M




                                                                                                                                                                                                                                                               Low Priority Projects
                     Prioritise pedestrians
                     at road and driveway
                     crossings



                                                                                                                                                                                                                                          1:2750 (A3)


                                                                                                                                                                                                                                          0       20    40               100




                                                                                                                                                                                                                                                                                            17
Log in to download the original file

Noosaville Foreshore Infrastructure Master Plan.pdf · 9.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.