Original source · versioned page text
NOOSAVILLE FORESHORE INFRASTRUCTURE MASTERPLAN · Noosaville Foreshore Infrastructure Master Plan
Plans and drawings: the text below has words only, no drawings.
Pelican
Beach Park Strategies:
— Retain strong river and beach access and accessible
pedestrian connections
“Pelican Beach Park continues
— Preserve the character of the foreshore and recreation
to support recreational use opportunities
of the green open spaces and — Protect our rivers edge through vegetation and tree
support only very limited levels canopy cover
of other low-impact land use Beach nourishment
activity.” Riverside gathering platform
provides beach access, seating Facilities for community gathering
and facilities - hide consolidated including shelters, BBQs, Terrace Marina
stormwater outfall underneath showers, tables, furniture
Proposed all-ages, all-abilities play Beach nourishment -
opportunities to vary the recreational Low planted slope
offering along the foreshore
Swimming area protected
from motorised watercraft
Retain and enhance grassed open Grassed open space with
space with tree planting creating tree planting creates a shady,
a shady, informal gathering and informal gathering and picnic
picnic space overlooking the river space overlooking the river
C E Legend
Riverside gathering platform
R R A
T E
provides beach access, seating Perspective Viewpoint
Beach nourishment
and facilities - hide consolidated - Grassed slope Enhanced pedestrian
E
P I
stormwater outfall underneath crossing creates safe Precinct Boundary
M connections to parkland
G Y Existing Feature
On-street
Resilience Strategy
cycle lanes
Proposed Feature
Enhanced pedestrian
Retain existing on-street
crossing creates safe Feature Planting
parking and investigate timed
connections to parkland
regulation in further studies
Parkland Planting
Retain existing on-street Tidal Planting
U-Drive
Boat Hire parking and investigate timed
regulation in further studies Erosion Control Planting
E E T
Proposed Feature Trees
Widen and upgrade shared path to
improve accessibility and legibility
Existing Trees
S T R
Nature based stormwater
management - rain gardens Stormwater Outfall
1:1000 (A3)
PWD Parking Bays
E S
0 10 20 50
Drop Off & Loading Zones
J A M
Bus Stops 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.