2025
Landuse Master Plan Additional
AND CHAP* studies
The Noosaville Foreshore Infrastructure Master Plan (NFIMP) was the next necessary step
for Council to guide the foreshore, following the Noosaville Foreshore Land Use Master Master
Plan (2018) and the Noosa Coastal Hazards Adaptation Plan (CHAP, endorsed by Council in
November 2021).
Plan
This Master Plan establishes a framework for the future of the Noosaville Foreshore. In many
instances, additional studies will be needed before advancing with the design development
of proposed outcomes, to ensure suitability and feasibility.
8 years
This Master Plan is intended to guide development at the Noosaville Foreshore for the next
Project-by-project planning,
20 years. The proposed staging illustrates the continued roll out of high, medium and low engagement, design and delivery
priority projects through planning, engagement, design and delivery during that period. The
implementation approach is flexible and able to change based on the communities evolving High Priority
Concept + Detailed Design + Construction
needs and available funding avenues. Projects
Adaptability
The resilience strategies in this Master Plan are flexible, adaptive, and staged so they can
respond over time to changing weather events, erosion, inundation, natural influences, and
14 years
shifts in community values. There is an exciting opportunity to trial the resilience strategies
and Master Plan approaches as pilot projects, allowing us to monitor their efficiency before
committing these outcomes along the foreshore.
Medium Priority
Projects Concept + Detailed Design + Construction
Engagement
As each project progresses through its planning and design phase, the community will
have opportunities to actively shape the final design outcomes. Key projects highlighted for
community input include upgrades to Pirate Playground, the outdoor stage and the tennis
court.
20 years
Together, Council and the community will shape the future of the Noosaville Foreshore.
Low Priority
Concept + Detailed Design + Construction
Projects
35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.