Council archive · source document
Decision Letter - Change to an Existing Approval - 010.2006.00001015.002 [As Published] · 142006.1015.02
2006/1015 and Managing Development Involving Acid Sulfate Soils’ with reference to the SPP Guideline: Acid Sulfate Soils’, the Guidelines for Sampling and Analysis of Lowland Acid Sulfate Soils in Queensland 1998° and the Queensland Acid Sulfate Soil Technical Manual: Soil Management Guidelines’. (Refer to: www.nrm.qld.gov.aw/land/ass/policies). If the proposed development will involve excavations of soil or sediment below 5m AHD that total between 100m? and 1000m? in volume, or involves filling with between 500m’ and 1000 m? of material then NRMW advise that ASS investigations and management should be undertaken in accordance with the above-mentioned documents to the satisfaction of Council, however do not need to be sent to NRMW for review. Irrespective of the volume of disturbance, specific reference should be made to Section 9 of the SPP Guideline that discusses treatment levels required to treat all potential and existing acidity. These treatment levels are based on mass (tonnes) of soil to be excavated and levels of sulfidic sulfur (percentage). For low level, medium level, high level and very high level of treatment, the Draft SPP Guideline provides advice on suitable management measures. For extra high treatment levels, ie where greater than 25 tonnes of agricultural lime is necessary, a detailed environmental management plan is required. For disturbances less than 1000m?, NRMW can provide assistance to local governments when developments entail an extra high treatment category, and for smaller scale disturbances, the guidelines associated with the SPP should be consulted. THIRD PARTY ADVICE Aboriginal Cultural Heritage Act 2003 Under section 23 of the Aboriginal Cultural Heritage Act 2003 a person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage (the "cultural heritage duty of care"). Maximum penalties for breaching the duty of care are $750,000 for a corporation and $75,000 for an individual. You will comply with the cultural heritage duty of care if you are acting in accordance with gazetted cultural heritage duty of care guidelines. An assessment of your proposed activity against the duty of care guidelines will help determine whether or to what extent Aboriginal cultural heritage may be harmed by your activity. It will also help determine if you need to undertake a search of the cultural heritage database and register. If following an assessment of the duty of care guidelines you believe cultural heritage may be harmed by your proposed activity, you should contact the Cultural Heritage Coordination Unit for further advice on (07) 323 83838 or e-mail cultural [email protected]. ' SPP 2/02 and SPP Guideline is available from the Queensland Acid Sulfate Soils Investigation Team- 07 3896 9819 on request. . 2 The SPP Guideline: Acid Sulfate Soils provide general guidance on acid sulfate soils investigations, groundwater investigations, and treatment and management of disturbed acid sulfate soils and drainage waters. Ahern ef al. 1998 — available from QASSIT 07 3896 9819 on request * Dear SE, Moore NG, Dobos SK, Watling KM and Ahern CR (2002). Soil Management Guidelines. In Queensland Acid Sulfate Soil Technical Manual. Department of Natural Resources and Mines, Indooroopilly, Queensland, Australia. Department of Natural Resources Mines and Water Page 2: Page 13 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - 010.2006.00001015.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 218 KB (small file)
- File type
No other editions are linked here.