Council archive · source document
Decision Letter - Change to an Existing Approval - 010.2006.00001015.002 [As Published] · 142006.1015.02
2006/1015
12. As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94 Zone
56 coordinate value to the standards and requirements of the Assessment Manager are required
for Council records. Such 'as constructed' drawings will be required prior to works being accepted
"on maintenance", where applicable. Requirements for "as constructed" information are detailed
in the current version of Council's Engineering Design Standards (Water & Sewerage) Manual.
Release of plans of survey and/or acceptance of the works on-maintenance will not be
considered until lodgement of satisfactory 'as constructed' records.
Please note that bonding of outstanding works will not be considered by Council.
13. Your company, as Consulting Engineers for the project, is responsible for arranging all
inspections and ensuring that all relevant details required by Council are supplied. The attached
Water and Sewerage Inspection Report form is to be kept by you and presented to Council's
Inspector at each stage of the development requiring a meeting or inspection. The Inspector will
sign the form at each stage when conditions have been satisfied. The works will be accepted 'on
maintenance' when this form, signed by the Inspector for each stage, is returned with a letter
requesting that it go 'on maintenance'.
14. Construction work and other associated activities are permitted only during the hours of 7:00am
and 6:00pm Monday to Saturday. No work is permitted on Sundays or public holidays, except
where extended hours are approved by the Assessment Manager or his nominee.
15. Cut-ins to existing live sewer are to be performed by Approved Contractor. Noosa Council Works
Inspector shall be present during any work on live sewer undertaken by contractor. An additional
fee of $140.00 (included below) is required to cover costs associated with these live sewer works.
16. Fees applicable to the above project are listed below:-
Plan Examination $ 14,700.00
Inspection Fee $ 14,700.00
Checking as-constructed data $ 120.00
CCTV fee $ 6,805.00
Live sewer inspection $ 140.00
BALANCE $ 36,465.00 (PAID 15.05.06 - RN. 183314)
17. Approval of these plans has been taken as a Notice of intention to commence works on the
development.
18. Council will provide all fittings and valves for the cut-in to the existing water supply as well as
labour to perform the cut-in. The Developer shall bear the actual cost of this work, and payment
shall be made before the cut-in is done.
19. All water connection fees are to be paid prior to the pre-start meeting.
The water main must be commissioned prior to installing the water services and water meters.
The water service tappings on the new water main/s within the development must be undertaken
by an approved subcontractor under direct Council supervision. Tappings on water mains not
constructed as part of the development works are to be carried out by Noosa Shire Council at
developer’s cost.
Page 8 of 16
[OCR of page images]
2006/1015
12.
13.
14.
15.
16.
17.
18.
19.
As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94 Zone
56 coordinate value to the standards and requirements of the Assessment Manager are required
for Council records. Such 'as constructed’ drawings will be required prior to works being accepted
"on maintenance", where applicable. Requirements for "as constructed" information are detailed
in the current version of Council's Engineering Design Standards (Water & Sewerage) Manual.
Release of plans of survey and/or acceptance of the works on-maintenance will not be
considered until lodgement of satisfactory 'as constructed’ records.
Please note that bonding of outstanding works will not be considered by Council.
Your company, as Consulting Engineers for the project, is responsible for arranging all
inspections and ensuring that all relevant details required by Council are supplied. The attached
Water and Sewerage Inspection Report form is to be kept by you and presented to Council's
Inspector at each stage of the development requiring a meeting or inspection. The Inspector will
sign the form at each stage when conditions have been satisfied. The works will be accepted 'on
maintenance’ when this form, signed by the Inspector for each stage, is returned with a letter
requesting that it go ‘on maintenance’.
Construction work and other associated activities are permitted only during the hours of 7:00am
and 6:00pm Monday to Saturday. No work is permitted on Sundays or public holidays, except
where extended hours are approved by the Assessment Manager or his nominee.
Cut-ins to existing live sewer are to be performed by Approved Contractor. Noosa Council Works
Inspector shall be present during any work on live sewer undertaken by contractor. An additional
fee of $140.00 (included below) is required to cover costs associated with these live sewer works.
Fees applicable to the above project are listed below:-
Plan Examination $ 14,700.00
Inspection Fee $ 14,700.00
Checking as-constructed data $ 120.00
CCTV fee $ 6,805.00
Live sewer inspection $ 140.00
BALANCE $ 36,465.00 (PAID 15.05.06 - RN. 183314)
Approval of these plans has been taken as a Notice of intention to commence works on the
development.
Council will provide all fittings and valves for the cut-in to the existing water supply as well as
labour to perform the cut-in. The Developer shall bear the actual cost of this work, and payment
shall be made before the cut-in is done.
All water connection fees are to be paid prior to the pre-start meeting.
The water main must be commissioned prior to installing the water services and water meters.
The water service tappings on the new water main/s within the development must be undertaken
by an approved subcontractor under direct Council supervision. Tappings on water mains not
constructed as part of the development works are to be carried out by Noosa Shire Council at
developer's cost.
Page 8 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - 010.2006.00001015.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 218 KB (small file)
- File type
No other editions are linked here.