Original source · versioned page text
Appendix F - Bushfire Hazard Assessment & Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnBushfire Hazard Assessment & Management Plan v1 NCES REF: J000669 Lot 2 on RP131369 – 108 Black Mountain Range Road, Black Mountain Table 4 – Table 8.2.3.3 Bushfire Hazard Areas – Part 8 Overlay Code Noosa Plan 2020 PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSED SOLUTION Safety of people and property PO1 AO1.1 This Bushfire Hazard Assessment and Management Plan has been prepared to Development maintains the safety of people and Development which will materially increase the number of people maintain the safety of people and property from the adverse impacts of bushfire. property from the adverse impacts of bushfire. living or congregating on premises, including reconfiguring a lot, is not AO1.1 –The proposed Lot 2 BLE is located outside of a mapped medium or high located within a medium or high bushfire hazard area. bushfire hazard area as depicted on the Local Hazard Area Map BF03. AO1.2 AO1.2 – The development has provided a minimum 170m setback between the Development maximises setbacks from hazardous vegetation to proposed Lot 2 BLE and the hazardous vegetation located to offsite to the west. achieve an acceptable risk. This setback achieves an acceptable risk where the mitigation measures detailed within this report are employed. Editor’s Note —PSP8 Natural Hazards provides guidance for assessing bushfire hazard risk and preparing a bushfire hazard management plan. Impact on Ecologically Important Areas PO2 No acceptable outcome provided No clearing of vegetation for bushfire mitigation measures is required. The Bushfire mitigation measures do not adversely impact bushfire mitigation measures prescribed herein will not adversely impact on on: biodiversity values, connectivity, ecosystem functioning, and the long-term physical integrity of waterways, wetlands and areas of native vegetation. a) biodiversity values, connectivity and ecosystem functioning; and b) the long term physical integrity of waterways, wetland and areas of native vegetation. Water Supply for Fire Fighting Purposes PO3 AO3.1 PO3 – The site will not be connected to a reticulated water supply. Water supply Development provides an adequate water supply for Premises are connected to the reticulated water supply. recommendations have been set herein consistent with SPP Assessment firefighting purpose which is reliable, safely located and Benchmark water supply requirements. freely accessible. Editor's note—For reconfiguring a lot, water supply needs to provide for a minimum flow and pressure of 10 litres a second at 200kPa at all times for firefighting purposes. OR AO3.2 Where there is no available reticulated water supply, the premises has: a) an accessible dam, swimming pool or water tank available for firefighting purposes with an onsite water volume of not less than 5,000 litres; and b) a water supply outlet pipe 50 millimetres in diameter fitted with a standard fire brigade fitting connected to the water supply (other than where the water supply is in a swimming pool or dam). © 2021 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.