Skip to the record
Every meeting, every word.

Original source · versioned page text

2020-07-16 Special Meeting Agenda

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SPECIAL MEETING AGENDA   16 JULY 2020




                         Page 27 of 40

SPECIAL MEETING AGENDA                                                   16 JULY 2020

  Ancillary Dwelling Unit {CODE FEES}                                  2,519.00
  Ancillary Dwelling Unit {IMPACT FEES}                                3,148.00
 Type 2: Duplex {CODE FEES}
  Type 2: Duplex {IMPACT FEES
  Type 3: Retirement and special needs: Fee per unit, 1-3 units {CODE FEES
  Type 3: Retirement and special needs: Fee per unit, 4-20 units {CODE FEES
  Type 3: Retirement and special needs: Fee per unit, more than 20 units ge og
  CODE FEES                                                             563.00
  Type 3: Retirement and special needs: Base Fee, 1-5 beds {CODE FEES
  Type 3: Retirement and special needs: Fee per bed, 6-25 beds {CODE    508 99
 FEES                                                                   228.00
  Type 3: Retirement and special needs: Fee per bed, more than 25 beds  te og
  CODE FEES
  Type 3: Retirement and special needs: Fee per unit, 1-3 units {IMPACT 3069.00
 FEES                                                                  3,059.00
  Type 3: Retirement and special needs: Fee per unit, 4-20 units {IMPACT 4536 00
 FEES                                                                  1,236.00
  Type 3: Retirement and special needs: Fee per unit, more than 20 units a3 99.
   IMPACT FEES                                                          703.00
  Type 3: Retirement and special needs: Base Fee, 1-5 beds {IMPACT FEES 9 180.00
  Type 3: Retirement and special needs: Fee per bed, 6-25 beds {IMPACT   87 99
 FEES                                                                   287.00
  Type 3: Retirement and special needs: Fee per bed, more than 25 beds ag 99
   IMPACT FEES                                                          192.00
  Type 4: Conventional: Fee per unit, included 1-3 units {CODE FEES
  Type 4: Conventional: Fee per unit, 4-20 units {CODE FEES
  Type 4: Conventional: Fee per unit, more than 20 units {CODE FEES:
  Type 4: Conventional: Fee per unit, included 1-3 units {IMPACT FEE
  Type 4: Conventional: Fee per unit, 4-20 units {IMPACT FEES          1,236.00
  Type 4: Conventional: Fee per unit, more than 20 units {IMPACT FEE:
  Type 5: Relocatable: Base Fee {CODE FEES
  Type 5: Relocatable: plus per site maximum fee capped at 60 sites {CODE ay
  FEES
  Type 5: Relocatable: Base Fee {IMPACT FEE                            6,195.00
  Type 5: Relocatable: plus per site maximum fee capped at 60 sites {IMPACT ge oy
 FEES                                                                    85.00
  Type 1: Home Hosted {CODE FEES

                                                                         Page 27 of 40
Log in to download the original file

2020-07-16 Special Meeting Agenda(PDF, 2MB).pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.