(c) the ground surface within 1 metre of the revetment wall must be grass or ground
cover and must not include shrubs, hard pavement or artificial grass.
(d) any side boundary fencing must taper down to a maximum height of 1.2 metres at
the revetment wall and have a height not exceeding 1.5 metres at a distance of
2.25 metres from the revetment wall.
(e) any retaining structures, planter boxes or the like must be finished with natural
materials such as timber or rock rather than manufactured materials.
ENGINEERING
Bonds
8. A site compliance bond of $3,000 is to be submitted to Council prior to the
commencement of works. The commencement of works can only commence once
Council's Construction Engineering Officer has confirmation that the bond monies have
been received by Council.
9. The bond will be refunded less any costs incurred by Council in ensuring compliance
with these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
10. Bonds must:
(a) meet the requirements of council’s relevant Planning Scheme Policy for
performance and uncompleted works;
(b) be lodged with Council and accompanied by the Bond Administration Fee/s; and
(c) be requested for release by writing to Council, when relevant approval
requirements have been met.
Flood Storage / Revetment Wall
11. All works must be carried out in accordance with the approved plans and Reference
Document Operational Works Flood Storage Calcs (22-1281-C1 and 22-1281-C2 Rev
B) prepared by Lindsay Consulting Pty Ltd.
12. Certification of the completed works within the 4.5m setback from the revetment wall
must be submitted to Council within 3 months of the completion of the works. The
certification must be prepared by a RPEQ (Registered Professional Engineer of
Queensland) and state that the works:
(a) have not negatively impacted the stability of the revetment wall or negatively
impacted the associated membrane;
(b) have not reduced the available flood storage within the lot from the profile as
described in The Noosa Plan 2020 – Low Density Residential Zone Code; and
(c) be generally in accordance with Operational Works Flood Storage Calcs (22-1281-
C1 and 22-1281-C2 Rev B) prepared by Lindsay Consulting Pty Ltd.
5. REASONS FOR REFERRAL AGENCY’S DECISION
The proposal is subject to specific built form parameters outlined in The Noosa Plan (26
September 2025).
6. REFERENCE DOCUMENT
Plan No. Rev. Plan/Document Name Date
22-1281-C1 B Operational Works Flood Storage Calcs prepared by 15/09/2025
Lindsay Consulting Pty Ltd
Page 3 of 4
Document Set ID: 24349631
Version: 2, Version Date: 02/12/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referral Agency Response - Planning ERR25 0010 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 114 KB (small file)
- File type
No other editions are linked here.