Original source · versioned page text
2016-10-11 P&E Committee - Item 2 - Attachment 1 - New Noosa Plan Discussion Paper
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnORDINARY MEETING MINUTES 15 SEPTEMBER 2016
25. The development must be carried out in accordance with section 7.0 of the
Bushfire Hazard Assessment and Management Plan (document ref.
AA1345BFIRE Rev.3) dated July 2016 prepared by Duke Environmental listed
within this Decision Notice.
28. External works, pathways, must be provided in accordance with an Operational
Works approval, unless already constructed, and must include in particular:
a. A new 2.0 metre wide concrete pathway must be constructed along the full
length of the eastern boundary lines for Lot 6 SP178340 (this property) and
Lot 3 SP 221524 (the adjoining site) generally within the created pathway
reserve and to alignment protects existing trees.
b. A new concrete pathway must be constructed within the unformed road
reserve south to the site. This pathway must connect to the pathway along
the eastern boundary and connect to the existing cul-de-sac end of Resort
Drive, and shall be 2.0m wide and reduced to a minimum width of 1.5 meter
where necessary to protect existing vegetation.
The pathways must be designed and constructed in accordance with relevant
standards and best engineering practice using method/s of construction that
minimising impact on natural flora and fauna and maintenance needs also
ensuring pedestrian safety.
This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
being non-trunk infrastructure.
49. Where stormwater runoff from the site will enter the Noosa Springs Lake System,
Quarterly monitoring is required of stormwaters directed from the development
to the Noosa Springs Lake System. Monitoring must be undertaken by a suitably
qualified person using NATA accredited methods for the following parameters.
Nitrite plus Nitrate as N (NOx)
Total Kjeldahl Nitrogen (TKN)
Total Nitrogen as N (TKN + NOx)
Total Nitrogen as N
Total Phosphorus as P
Reactive Phosphorus as P (Dissolved)
Reactive Phosphorus – Filtered
Water quality monitoring results must be retained in electronic form by the
property owner for a minimum of 5 years and must be made available to Noosa
Council on request. This monitoring must continue until notified by Noosa Council
that it is no longer needed.
B. Authorise Council’s Chief Executive Officer to Execute the Voluntary Vegetation Offset
Agreement.
2 REC16/0015 - APPLICATION FOR A DEVELOPMENT APPROVAL FOR A
RECONFIGURATION OF A LOT (1 LOT INTO 2 LOTS AND ACCESS EASEMENT)
SITUATED AT 2 DAVID LOW WAY, CASTAWAYS BEACH
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 6 September 2016 regarding Application No. REC16/0015 for a
Development Permit for Reconfiguring a Lot (1 lot into 2 lots and Access Easement) situated
at 2 David Low Way, Castaways Beach and issue a Preliminary Approval in accordance with
the conditions contained in the Planning & Environment Committee Agenda dated 6
September 2016.
Page 6 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.