Original source · versioned page text
Installation steps
8. Placing Infill
• Operating Vehicles
• Ensure 7 cm minimum infill before
driving on cells
• Minimize speed, braking, turning
• Placing Infill
• Overfill cells >7 cm above cells
• Limit drop height to 1m
• Compact infill with blade (shovel)
• Remove large debris
• No cells exposed
Insert video
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Installation steps.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.