. RECORD KEEPING

It is proposed to maintain a record of the volume of excavation material and the
location of placement. The record is to be updated at the end of each working
day.

It is proposed to maintain a copy of all purchase and delivery documentation
describing the quantity of lime delivered to the site

Itis proposed a suitably responsible person (eg. geotechnical engineer, engineer,
surveyor, project manager, etc) supervise the lime treatment procedure to ensure
the correct quantity of lime is applied. A daily record of this activity is to be
maintained.

If any water is retained on the site and requires discharge then a record of the
water pH and any corrective action is to be maintained by a suitably responsible
person.

All records (eg. validation analysis, excavation, placement, lime delivery, lime
treatment and water quality) are to be retained for a period of five years by the
project manager.

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2023 - Response to Information Request [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.