* . RECORD KEEPING It is proposed to maintain a record of the volume of excavation material and the location of placement. The record is to be updated at the end of each working day. It is proposed to maintain a copy of all purchase and delivery documentation describing the quantity of lime delivered to the site Itis proposed a suitably responsible person (eg. geotechnical engineer, engineer, surveyor, project manager, etc) supervise the lime treatment procedure to ensure the correct quantity of lime is applied. A daily record of this activity is to be maintained. If any water is retained on the site and requires discharge then a record of the water pH and any corrective action is to be maintained by a suitably responsible person. All records (eg. validation analysis, excavation, placement, lime delivery, lime treatment and water quality) are to be retained for a period of five years by the project manager.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2023 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.