a. Lime Treatment Strategy IF REQUIRED. A safety factor of two is recommended for sites regarded as sensitive to acid export. These include areas: * within 50 metres of a drainage line, stream or other surface water * where the watertable is within 2 metres of the surface * where the site is below the 50 year flood tine. A safety factor of 1.8 is recommended where more than 5% of samples have a %Spos or %S¢, greater than 0.03% or TAA greater than 100 moles/ton. A safety factor of 1.6 can be used for samples with lower levels of acidity or potential acidity. The treatment rate is calculated using the average of all samples with a % S,,, > 0.03%. The worst case sample must have a minimum safety factor of 1.2. In the absence of field bulk density measurement the design in-situ bulk density is 1.65 tons/cubic metre and the excavated (loose spread, uncompacted) soil bulk density is 1.2 tons/cubic metre. b. Lime Application It is recommended the disturbed soil is spread across fill areas in layers with the appropriate quantity of lime being spread across the surface. The lime is then cultivated through the layer to provide uniform mixing. The depth of the fill layer will be affected by compaction requirements, machinery, the physical condition of the soil and operator preference. The exact method of mixing is of no consequence provided lime is mixed uniformly through the placed soil. It is stressed care should be taken with mixing as validation samples will subsequently be taken for chemical analysis. If the uniformity of mixing is poor the validation tests are likely to fail. c. Lime Storage Agricultural lime and hydrated lime (builders lime, calcium hydroxide) needs to be stored on-site in a secure manner. It is recommended the hydrated lime (normally supplied in bags) is held in a locked shipping container or similar site building. It is recommended the agricultural lime is held in a bunded storage area. If supplied in bulk then the lime should be covered to prevent dust becoming a nuisance. d. Placement of Excavated Soil It is preferred to retain treated soil on the development area. If off-site placement is required then the following actions must be undertaken: the land holder must agree in writing to accept the treated material the land holder must be provided with copies of soil analysis reports and a written declaration of the volume and placement location prior to placement local authority must be provided with copies of soil analysis reports and a written declaration of the volume and placement location. Check with the local authority to ensure the placement complies with any local regulations. transport of treated soil should be performed using covered vehicles and no drainage water must escape onto public access areas
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2023 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.