f. Treatment Pad Design If lime is incorporated with soil at a specific mixing area then the treatment pad should be bunded (as specified in section 4.e). If the pad floor is constructed from untreated acid sulfate soil then the floor must be lime treated as specified in section 4.a. Validation testing of lime treated samples will require time for sampling, sample transport to a laboratory, sample drying and analysis. This process can easily require 5-7 working days. The treatment pad and any storage areas need to be sized to accommodate treated soil that remains to be validated. q. Exposed Cut Surfaces If excavation areas will be left exposed then these should be capped to minimise oxidation of sulphidic and acid soil. The minimum depth of limed capping should be 800 mm. i, Vegetated Cover If the excavated area is to be revegetated then topsoil should be placed at the surface. The lime treatment rate is conservative and an alkaline soil pH is expected. This may not suit re-vegetation and could result in nutrient deficiency (eg. Zn, Fe, Mn & P). To avoid this problem it is recommended the existing 0-200 mm soil layer is stripped from the site and ystockpiled. This assumes the 0-200 mm soil layer is currently vegetated, non-saline, well oxidised and non-sulphidic. Care must be taken to restrict the topsoil removal to this depth to avoid sulphidic material deeper down. The final placement over the cut material should be: 0-200 mm __ replaced topsoil, uncompacted for revegetation (existing pH/acidity) 200-400 mm __ limed cut material, low level of compaction to allow for drainage and root penetration (strongly alkaline, no acidity) 400-1000 mm _limed cut material, high level of compaction to minimise oxidation and deep drainage (strongly alkaline, no acidity) ii. Non-Vegetated Cover lf the excavated area is not to be revegetated then no topsoil is required. The final placement over the cut material should be: 0-800 mm _ limed cut material, high level of compaction to minimise oxidation and deep drainage (strongly alkaline, no acidity) h. Runoff Control It is recommended a runoff diversion drain be constructed to divert runoff water away from untreated excavated soil and excavation areas should these lie within a runoff pathway. The drain should be checked daily to ensure it is servicable. i, Ponded Water
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2023 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.