Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Information Response -OPW18 0304 - Dam Excavation - 95 Hollett Rd.pdf.msg · OPW18/0304

of 1

Text shows just the words. Original shows the document exactly as it was published.

Subject: RE: Information Request OPW18 0304 - Dam Excavation - 95 Hollett Rd.pdf
From: Joe Thurgood
Date: 2018-12-04T00:51:18+00:00
To: Monkeith Kadhum, [email protected]

Morning Monkeith,

With regards the information request, please find response below;

The procedure we plan on adopting to drain the dam prior to the start of extension earthworks is to run the existing pump to hoses on the site which will end up following the overland path through to the adjoining Par 3 golf course, and into the creek situated at the base of the hill.

I’ve attached the email received from the Par 3 superintendent who agreed to this when contacted by Scott Guildford (owner). I spoke with Connor from council and verbally advised that the water would travel 70-80m via well grassed overland flow path before making the creek. The flow rate of water will be done via standard garden hoses to eliminate any chance of erosion.

I’ve also attached a plan showing current location of the weir for reference.

Please feel free to call me if further clarification is required.

Cheers

 

 

Regards

 

 

Joe Thurgood

Estimator / Office Coordinator



https://sites.google.com/site/markbainconstructions/

Mobile: 0418 708 836

	
Office: 07 5447 4443

	
Fax: 07 5474 5127

	

 

 

From: Monkeith Kadhum [mailto:[email protected]] 
Sent: Thursday, 29 November 2018 2:47 PM
To: [email protected]
Cc: Joe Thurgood; 'Tim McKenna'
Subject: Information Request OPW18 0304 - Dam Excavation - 95 Hollett Rd.pdf

 

Hi John,

Please find attached Information Request regarding the above OPW application.

 

Regards,

 

Monkeith Kadhum

Development Engineer I Environment Engineering Assessment I Noosa Council

Phone:                    07 5329 6293
Email:        [email protected] <mailto:[email protected]>  

Website:    www.noosa.qld.gov.au <http://www.noosa.qld.gov.au/> 

Location:   Level 3, 9 Pelican Street, Tewantin
Mail:          PO Box 141 Tewantin Qld 4565

                      Find Council on Facebook  <https://apac01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2Fnoosacouncil&data=02%7C01%7C[email protected]%7Cd88c5b676285450b21bb08d65981fca0%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C636794812701318302&sdata=PWuJOe7R%2B%2B8LI%2F4CrFN9BW0I9BIAzYai2Zi5ZTb%2BBuQ%3D&reserved=0>

Used in these records

About this file

File size
574 KB (small file)
File type
MSG

No other editions are linked here.

Original file

Log in to download the original file

Information Response -OPW18 0304 - Dam Excavation - 95 Hollett Rd.pdf.msg · 574 KB (small file)

Attachments

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.