Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Appendix 1 - DA Permit 04-0429 Approval

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Noosa Council documents




               Environment & Planning Committee Reports 22/10/04 - Ordinary Meeting 4/11/04 6
               A newly constructed sewer main is located adjacent to the proposed extensions. The
               applicant has amended the proposal such that the new building works will be located clear the
               sewer zone of influence. The applicants will be required to design footing for structures such
               that no surcharge loading is applied to the sewer main.

               In addition to this the applicant will also be required to create an easement over those parts of
               the sewer that impact on the subject site.

               Town Water Supply

               The existing duplex is has existing connection to Council water supply system.

               Service Easements

               An easement will be required to be created over the existing sewer main as previously
               mentioned.

               Headworks

               Water Supply and Sewerage Headworks are payable in accordance with Council’s Planning
               Scheme Policies PSP28 and PSP30 respectively.

               Erosion and Sediment Control

               Erosion and sediment control devices will be required to be installed over the development
               site and maintained during the construction phase.

               It may also be necessary that these devices be kept and maintained for a period of time after
               the construction phase and until the site is stabilised with vegetation and the risk of erosion
               has been greatly reduced.

               Bonds

               Given the extent of earthworks and general construction required for this development, it is
               considered appropriate to require a $2,000 bond to ensure no damage occurs to the
               environment and/or to any of Council’s infrastructure. This amount should however be
               combined with other bond money required by this permit to form one amount which can be
               considered as the Compliance Bond.

               7     CONCURRENCY AGENCY REPONSES (EPA)

               The Environmental Protection Agency acting as a concurrency agency for contaminated land
               (UXO) has reviewed the application and advises that they have no objection to the proposal
               provided that their concurrency agency conditions are attached to the development approval.

               8     CONCLUSION

               The proposed extensions to the existing Duplex Dwelling on the subject land is consistent
               with the objectives of the Strategic Plan and complies with the majority of the development
               standards as outlined in the Planning Scheme.




                                                                                                   Print Date: 15 July 2020, 2:02 PM
Log in to download the original file

Appendix 1 - DA Permit 04-0429 Approval.pdf · 706 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.