Skip to the record
The gold standard in government transparency.

Council archive · source document

Referral Agency Response - Planning RAP21 0020 · OPW21/0315

of 7

Text shows just the words. Original shows the document exactly as it was published.

       b.    has a degree in civil engineering or engineering geology; and
       c.    has a minimum of 5 years experience in the field of geotechnical engineering or
             engineering geology.
       Construction Management
9.     The site is located in a constrained location and the construction of the proposed
       development (demolition, excavation, deliveries, staff parking etc) has the potential to
       impact on the local area. If the construction of the proposed development requires
       occupation of the road reserve (verge area and/or road formation) for either short term
       or long term, a road reserve permit must be obtained from Council prior to any
       occupation of the road reserve. Please note any damage to the existing road reserve as
       a result of construction activities must be fully repaired at the applicant’s expense.
10.    A Construction Management Plan for the works must be prepared and put in place
       before the commencement of the works, and must address the following:
       a.    appropriate traffic signage in accordance with the Manual of Uniform Traffic
             Control Devices (MUTCD);
       b.    provision for safe pedestrian access across the frontage of the site both during
             daily construction and after daily construction has ceased
       c.    staff parking;
       d.    other construction vehicles.
       Private Infrastructure
11.    All private infrastructure for the development must be designed to meet the planning
       scheme requirements unless otherwise agreed by the relevant authority
6.     REPRESENTATIONS ABOUT REFERRAL AGENCY RESPONSE

The applicant may make representations to Council about this referral agency response at
any time before the application is decided pursuant to section 30 of the Development
Assessment Rules.


Yours faithfully,




Maxwell Potter
Graduate Development Planner

Enc:   Approved Plans/Documents




                                                                                        Page 7 of 7

Used in these records

About this file

File size
358 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Referral Agency Response - Planning RAP21 0020.pdf · 358 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.