Council archive · source document
Appendix D - Infrastructure Services Assessment · MCU12/0133
From the archive Development Application Part 2 of 2, 2 - Forms, Owner's Consent, Charitable Organisation Status, 3 - Town Planning Report (Noosa FLC), Appendix A - Code Ass Tables.,Appendix B - Proposal Plans.Appendix C - Archit Design Statement. File date in the archive: 2012-08-27 16:43.
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
Mains Cable Plan N
c3003:AC-B18/1-12 12F/- SMOF FNPEHJ/STD
W (AA) E
DIST (AA)
AA
P100
c3003:AC-B18/1-12 12F/- SMOF FNPEHJ/STD (AA) S
DIST (AA)
AA
P35
6
98.0
B18
c3003:AC-B18/1-12 12F/- SMOF FNPEHJ/STD
10.0
3
22.0
56.0
SAR
5
ENA
c3003:AC-B18/1-12 12F/- SMOF FNPEHJ/STD (AA)
DIST (AA)
AA
P50
265.0
AB BB
AA BA
P100c9:M1-400 400 CPIUT MB
c9:M601-800 200 CPIUT MB
HE
c10:M801-1050 400 CPFUT MB
A
50DEADTH
c10:M1101-1200
LA
ND 12F/- SMOF FN
c3003:AC1-AY/1-12
DIST DR (BB)
DR
DIST(AA)
AA
P100
3
GIRRAW
EEN 36.0
AY
CT
AA
30.0
P100
0.6
--- BEA
2.5 C ON
CT
AB BB
AA BA c10:M801-1000 400 CPFUT MB (AA)
211.0
P100c10:M1001-1050
50DEAD
c10:M1101-1200
c9:M1-400 400 CPIUT MB (BA)
c9:M601-800 200 CPIUT MB (BA)
c3003:AY-B21/1-12 12F/- SMOF FNPEHJ/STD (BB)
2xDIST (BB)
c3003:AY-B21/1-12 12F/- SMOF FNPEHJ/STD (AA) AA
DIST (AA)
P50
c3003:AY-B21/1-12 12F/- SMOF FNPEHJ/STD (AA)AA
DIST (AA)
P50
c3003:AY-B21/1-12 12F/- SMOF FNPEHJ/STD (AA)
AA
DIST (AA)
P50
AA
c3003:AY-B21/1-12 12F/- SMOF FNPEHJ/STD (AA)
DIST (AA)
P50
c3003:AY-B21/1-12 12F/- SMOF FNPEHJ/STD (AA)
AA
DIST (AA)
P50
PL
c3003:B21-B22/1-12 12F/- SMOF FNPEHJ/STD <- (AA)
AA
P50
c3003:B21-B22/1-12 12F/- SMOF FNPEHJ/STD <- (AA)
AA
P50
AA
c3003:B21-B22/1-12 12F/- SMOF FNPEHJ/STD <- (AA) 0m 20m 40m 60m 80m 100m
P50
For all Telstra DBYD plan enquiries - Sequence Number: 25989562
email - [email protected]
For urgent onsite contact only - ph 1800 653 935 (bus hrs) CAUTION: Fibre optic and/ or major network present
TELSTRA CORPORATION LIMITED A.C.N. 051 775 556
in plot area. Please read the Duty of Care and
contact Telstra Plan Services should you require
Generated On 09/08/2012 09:52:19 any assistance.
WARNING - Due to the nature of Telstra underground plant and the age of some cables and records, it is impossible to ascertain the precise location of all Telstra plant from Telstra's plans. The accuracy and/or
completeness of the information supplied can not be guaranteed as property boundaries, depths and other natural landscape features may change over time, and accordingly the plans are indicative only.
Telstra does not warrant or hold out that its plans are accurate and accepts no responsibility for any inaccuracy shown on the plans.
It is your responsibility to locate Telstra's underground plant by careful hand pot-holing prior to any excavation in the vicinity and to exercise due care during that excavation.
Please read and understand the information supplied in the duty of care statement attached with the Telstra plans. TELSTRA WILL SEEK COMPENSATION FOR LOSS CAUSED BY DAMAGE TO ITS PLANT.
Telstra plans and information supplied are valid for 60 days from the date of issue. If this timeframe has elapsed, please reapply for plans.
Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D - Infrastructure Services Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.