Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2019-12-10 Planning & Environment Committee Agenda

of 84

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 10 DECEMBER 2019


Existing Condition
Condition 2
     Approved Plans
2.   Development undertaken in accordance with this approval must generally comply with the
     approved plans of development. The approved plans are listed in the following table unless
     otherwise amended by these conditions.

      Plan No.          Rev.   Plan/Document Name                                    Date

      C1.0              NA     Site Plan                                             16/05/19

      C2.0              NA     Basement                                              16/05/19

      C3.0              NA     Level 1                                               16/05/19

      C4.0              NA     Level 2                                               16/05/19

      C5.0              NA     Level 3                                               16/05/19

      C6.0              NA     Elevations                                            16/05/19

      C7.0              NA     Elevations                                            16/05/19

      28292-C1.1        A      Preliminary Driveway Plan, as amended and dated       17/04//2019
                               by SCG Consulting

      28292-OW5.1       A      Driveway Levels and Sections, prepared by SCG         17/04//2019
                               Consulting
                               As Annotated by Council

Assessment of Request
The updated suite of plans has been assessed, with the following changes proposed:
New Fire Stairs from the Basement to Ground Level
New stairs are proposed in the south eastern corner of the building, along the eastern façade,
providing a fire exit from the basement to ground level (exterior to the building).




                        Figure 1: New Fire Stairs Exit (Basement and Level 1)




                                                                                     Page 66 of 84
Log in to download the original file

2019-12-10 Planning & Environment Committee Agenda(PDF, 6MB).pdf · 6.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.