Original source · versioned page text
2019-12-10 Planning & Environment Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 DECEMBER 2019
The pump, at 3.6m wide, 1.2m deep and approximately 2.1m in height, is located to the rear of
the property within a screened 2.2m high enclosure. The fence forming the rear and western
portion of the enclosure is an existing 2.8m block fence. The pump requires a hardstand area to
comply with fire requirements. The pump is not anticipated to have any adverse impacts on
amenity from the street frontage, however due to proximity to the rear boundary, it is
recommended the pump be painted in subdued tones. Advice from the applicant stated:
The pump housing is not required to be painted red, it can be painted out. Signage will be
required to be painted in a contrasting colour and easily distinguishable
Therefore, the following additional condition is recommended:
Fire Pump
46. The diesel fire pump housing is to be of a muted tone, with signage of a contrasting colour
and easily distinguishable.
The change is considered necessary and will improve the safety of the residents’ onsite and is
therefore recommended to be supported.
Meter and Booster Assembly in North Western Corner of the Site
A meter assembly and booster assembly are proposed in the north western corner of the lot,
along the street frontage.
Figure 6: Proposed Booster Assembly and Meter Assembly
Figure 7: Proposed Booster Assembly and Meter Assembly Render
Page 69 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.