2016-08-15 General Committee Agenda

of 61

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ATTACHMENT 2




 Page 22 of 61

;         ;                                                                                                                                                             ATTACHMENT 2
Capital / Operating Capital

Sum of Proposed Carryover Amount
CAPEX Renewal/      CAPEX PROGRAM               Cost Centre / Project Description             Comments                                                                  Expense     Revenue     Grand Total
Uparade
   Renewal             Corporate Buildings         Noosaville Depot Fire protection system and Awaiting Contractors to commence works                                      44,898                     44,898
                                                   panel renewal
                    Corporate Buildings Total                                                                                                                             44,898                      44,898
                       Community Facilities       Sunshine Beach NAC - Hydraulics Report      Contractor due on-site in early August. All funds to be carried over.         6,500                      6,500
                                                  50mtr pool filtration
                                                  Sunshine Beach NAC - Replacement of         Project to be delivered in July 2016                                         13,444                     13,444
                                                   Program Pool heat pump
                                                   Noosa Leisure Centre and The J - Evac      Awaiting Contractors to commence works                                       14,500                     14,500
                                                  Centre Switchboards
                    Community Facilities Total                                                                                                                             34,444                     34,444
                      Fleet - Plant Replacement   Plant and Fleet Replacement Program         Delivery of 4 fleet items to be received July and August 2016.              386,438                    386,438
                    Fleet - Plant Replacement Total                                                                                                                       386,438                    386,438
                       Pathways & Enabling         Peregian Beach David Low Way Pathway Re- Project currently being designed and will be delivered this financial year. 50/50 141,206 - (75,000)      66,206
                      Facilities                  alignment                                   funding from property owner.
                                                   Noosa Heads Park Road, Boardwalk Design    Allows for $30K for additional design of foreshore at National Park carpark. 30,000                     30,000
                                                  and consultation                            Design nearing completion. Delayed for development of prototype and
                                                                                              consultant delays.
                                                  Sunshine Beach - Solar Bollard Replacement  Bollards have been delivered and will be installed early August.              2,164                      2,164
                                                  Trial
                                                   Noosa Heads Noosa Parade Road Corridor     Design commenced and this project is 50/50 grant funded                     161,617  - (75,000)         86,617
                                                   Upgrade - Design
                                                  Tewantin Poinciana Avenue Shared Path       Works nearing completion.                                                    84,224  - (67,500)         16,724
                                                   Upgrade Design & Construct
                    Pathways & Enabling Facilities Total                                                                                                                  419,212  - (217,500)       201,712
                       Holiday Parks               Noosa River Holiday Pk- Internal refurb    Funds required to assist with the final design works associated with the Project 11,198                 11,198
                                                                                              for delivery in the 2016/17 program
                    Holiday Parks Total                                                                                                                                    11,198                     11,198
                       Sealed Roads Network       Sealed Road Pavement surveys and            Remaining funds allocated towards Pavement Studies                            3,439                      3,439
                                                   Investigations
                                                  Whole of Shire - pavement surveys           Remaining funds allocated towards Pavement Studies                             1,350                     1,350
                                                  Tewantin Cooroy Noosa Rd Stages 2-6         Remaining budget amount required to cover all contingencies.                104,481                    104,481
                                                   Design Only
                                                  Whole of Shire Reseal & Rehabilitation      Carryover unused funds as there were a number of roads delayed at the end of 473,547                   473,547
                                                   Program                                    the financial year including David Low Way, Ben Lexcen Drive. Works to be
                                                                                              delivered July/August.
                                                  Sunrise Beach - Ben Lexcen Drive Southern   Funds to be used for renewal of kerb and pram ramps where required.         179,321                    179,321
                                                  end Road Corridor
                                                   Black Mountain Rd Landslip design &        Design works progressing                                                    299,265                    299,265
                                                  construct
                    Sealed Roads Network Total                                                                                                                          1,061,403                  1,061,403
                      Coastal Canals and Water    Noosaville - Gympie Tce / Williams St       Works are in progress and are due for completion late July.                  11,070                     11,070
                    Coastal Canals and Waterways Total                                                                                                                     11,070                     11,070
                      Parks & Playgrounds         Tewantin Spray Park Shade Sail              Works to be completed in August 2016.                                        37,264                     37,264

                                                                                                                                                                                         Page 22 of 61
Log in to download the original file

2016-08-15 General Committee Agenda(PDF, 12MB).pdf · 12.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗