Original source · versioned page text
Attachment 4 - Stormwater Managment Plan
The original of this document is very large (17.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn1. PROPOSAL OVERVIEW TMC Building Design Group has been engaged by Chris King & Joanne Hill to prepare a holistic Stormwater and Waste Water Management Plan for the proposed Car Wash and Take Away Food & Drink Outlet at 34 Elm Street in Cooroy. The proposed new development building and works consists of: 1. Two (2) Automatic Car Wash bays, 2. Two (2) Self-Serve Wash Bays, 3. Two (2) Super Bays, 4. Three (3) Vacuum bays, 5. Two (2) Dog Washes, 6. A Plant Room, Secure Storage and Store Room with staff amenities, 7. Fenced Bin area, 8. Stand-alone Take Away Food and Drink Outlet with attached Disabled Public Toilet, 9. Suitable landscaping and seated area. This report will investigate the full water cycle management for the site including; A. Stormwater Management, i. Compare Pre-Developed Site -v- Post-Developed Site runoff coefficients, ii. Model Stormwater harvesting from roofed areas, iii. Overall developed site Music Model, iv. Overall developed site water quality improvement systems to be adopted. B. Waste Water Management, i. Expected Car Wash and Dog Wash site patronage, ii. Mains Water usage and Sewer discharge with and without recycling equipment, iii. Customer Average Weekday, Peak Weekend, Flagship Event site daily patronage, iv. Compare Annual Mains Water usage and sewer discharge with and without recycling. C. Cooroy & LGA Car Wash Stormwater Pollution Calculator. i. Current conditions- Pre- proposed Car Wash development, ii. Future conditions- Post- proposed Car Wash development. -3- TMC Building Design Group
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.