Original source · versioned page text
Attachment 4 - Stormwater Managment Plan
The original of this document is very large (17.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSQIDEP Evaluation SPEL Basin, Sippy Downs
5. Conclusions
Based on the results presented and the analysis shown in this report, the authors are
satisfied that the BOE Application complies with the SQIDEP protocol and the performance
reduction claims shown at Figure 6 have been agreed.
It is recommended that these results and acceptance be packaged with the MUSIC nodes
and a technical guideline.
33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.