Attachment 4 - Stormwater Managment Plan

of 90

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (17.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Figure 4; BOM Detailed Rainfall Statistics for the closest weather station- Tewantin RSL Park.
Additional modelling during the construction documentation stage will help refine this
retention storage volume, regardless of the result a minimum 40 kL of retention rainwater
storage volume will be provided.


4.3. OVERALL DEVELOPED SITE MUSIC MODEL
The overall proposed preliminary stormwater design for the site has been conducted in
accordance with the Noosa Plan 2020, Part 9.4.8 Water Quality and Drainage Code. The resultant
treatment train is shown in Figure 5 below. This MUSIC (Model for Urban Stormwater
Improvement Conceptualisation) Model below only shows one (1) No. 20kL Retention rainwater
tank, where it is proposed to install two (2) No. 20kL Retention tanks.




Figure 5; MUSIC Stormwater Treatment Train and Effectiveness Model
This MUSIC model, the Proposed Preliminary Stormwater Site Layout Plan and this report shows
compliance (meets or betters the minimum design requirements) with the required
Performance Outcomes of the Stormwater Drainage Design P01 – P05, the requirements of the
Stormwater Quality and Protection of Receiving Waters P06-P09, and also Hydrology and waterway
stability PO10 – PO13 (Note: that some areas/requirements are not applicable or relevant to the
proposed works).



 -8-
             TMC Building Design Group
Log in to download the original file

Attachment 4 - Stormwater Managment Plan.pdf · 17.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.