11 DUST & AIRBORNE PARTICAL CONTROL
Person Responsible Contractor’s Site Manager
Operational Policy To achieve acceptable air quality standards through the control of
the movement of dust offsite from the site works.
Performance criteria The target level of complaints by nearby residents is no more than
one in every seven day period. Ambient air quality should not
deteriorate by more than 30% over a period of seven consecutive
days. Dust deposition at any nearby residence should not exceed
100mg/m2/day.
Implementation The minimisation of the movement of dust offsite will be achieved
through the following onsite practices.
Strategy
1. All permanent bunds and reshaped areas will be
revegetated within ten days after completion of earthworks.
(including service trenches)
2. Stockpiling onsite will be minimised where possible.
3. A water cart will be bought to site if required or watering via
the site water supply will be conducted during high-risk
times such as high winds and low rainfall and after the
receipt of a complaint.
4. Dusty activities to cease if wind speed exceeds 10m/sec.
5. Contractor’s staff to be trained to implement dust
minimisation measures.
Monitoring Dust inspections will be carried out to verify that dust mitigation
measures are being implemented. Dust monitoring will be
conducted upon receipt of complaints by residents. If dust
monitoring is to take place, the following will occur,
-Temporary dust deposition gauges will monitor the movement of
dust offsite at the nearest residences adjacent to the site in the
predominant wind direction.
Auditing Management to review the complaints register weekly and
corrective action taken.
Reporting The contractor is to notify NSC & EPA of a possible environmental
nuisance on receipt of 3 or more dust complaints in any 24hr.
Reports are to be provided to NSC upon request
Identification of Any dust related complaints by residents will indicate a failure of
dust control measures.
incident or failure
Corrective Action Locate the source of the dust and apply the following-
1. Apply water sprays to the vegetation
2. Cover or water exposed areas
3. If dust persists, cease the dust creating activities.
All dust complaints to be addressed in consultation with NSC.
HR DESIGN Reference No: 18-0165B Page 12 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.